UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Perbaikan pedoman hubungan kerja berdasarkan faktor risiko konsultan arsitektur dalam tahap konsep rancangan dan prarancangan arsitektur untuk meningkatkan keberlanjutan proyek = Improving employment guidelines based on risk factors of architecture consultant in concept design phase and architectural preliminary design phase to increase project s continuity / Arman Arief

Arman Arief; El Khobar Muhaemin Nazech, supervisor; Krishna Mochtar, supervisor; Rully Andhika, co-promotor; Yusuf Latief, examiner; Setyo Supriyadi Sipadi, examiner; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Tahap Konsep Perancangan dan Prarancangan Arsitektur adalah dua tahap awal dalam proses desain arsitektur. Pada tahap ini kontrak belum terbentuk dan hubungan antara arsitek dan pengguna jasa hanya didasari rasa percaya. Ketiadaan kontrak pada tahap ini melatarbelakangi risiko berhentinya suatu proyek pada konsultan arsitek. Pedoman Hubungan Kerja yang disusun oleh IAI seharusnya mampu menekan masalah pada kedua tahap ini, namun kenyataan dilapangan tidak demikian. Karenanya diperlukan analisa faktor risiko konsultan arsitek pada tahap awal ini untuk diperoleh tingkatan risiko dan strategi penanganan risiko dominannya. Dan dihasilkan perbaikan 5 pasal pada Pedoman Hubungan Kerja Arsitek dan Pengguna Jasa untuk meningkatkan keberlanjutan proyek.

ABSTRACT
Architectural Design Concept and Preliminary Design Stage are the earliest stage in the architecture design process. At this stage of the contract has not been formed and the relationship between the architect and the users only based on trust. The absence of the contract at this stage underlying the cessation risks on a project of an architect consultant. Employment Guidelines prepared by IAI should have been able to suppress this problem, but in reality it is not the case. Therefore requires an analysis of risk factors architect consultant at this early stage to obtain the levels of risk and dominant risk management strategies. This research produced improvements in 5 Article of Employment to improve the project continuity.

 File Digital: 1

Shelf
 T48265-Arman Arief.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T48265
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 210 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T48265 15-18-559141597 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20454204
Cover