UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Manajemen risiko pada proyek rekayasa, pengadaan, dan konstruksi pembangkit listrik tenaga panas bumi = Epc project risk management on a geothermal power plant

Mohamad Ilman Hasya; I Made Ardita Y., supervisor; Uno Bintang Sudibyo, supervisor; Chairul Hudaya, examiner; Ridwan Gunawan, examiner (Fakultas Teknik Universitas Indonesia, 2017)

 Abstrak

Seperti yang diketahui pemerintah Indonesia saat ini sedang menjalankan program 35000 watt, dimana dalam hal ini untuk memenuhi banyak permintaaan akan ketersediaan listrik yang ada di seluruh Indonesia. Karena sampai dengan saat ini berrdasarkan data yang ada jumlah perrmintaan akan listrik yang dibutuhkan masih melebihi jumlah pembangkit yang ada di seluruh Indonesia. Oleh karena itu pemerintah menjalankan program 35000 watt dengan harapan dapat memenuhi kebutuhan listrik yang diminta.
Dalam hal ini diperlukannya peran manajemen risiko dalam mengontrol pembangunan proyek EPC pembangkit tersebut. Dalam penelitian ini akan melihat risiko yang berpengaruh dalam pembangunan EPC pembangkit tersebut. Metode yang digunakan adalah deskriptif, kuisioner, serta validasi pakar yang kemudian data dari kuisioner akan diolah dengan perangkat lunak SPSS. Variabel yang digunakan dalam penelitian sebanyak 54 variabel risiko yang terjadi pada proses EPC.
Dalam penelitian ini didapatkan 9 variabel dominan yang berpengaruh pada pembangunan proyek EPC pembangkit yaitu 3 variabel dari tahap rekayasa, 2 variabel dari tahap pengadaan, dan 4 variabel pada tahap konstruksi serta mitigasi dalam mengatasi setiap risiko tersebut. Risiko yang didapat ternyata yang terbanyak masih berada pada tahap rekayasa dan konstruksi sehingga dibutuhkan pengontrolan yang lebih terhadap tahap tersebut untuk mencegah keterlambatan.

As of now Indonesia government are focusing on building on electricity program 35.000 MW, to provide and enlight across the country. Because as per current data Indonesia still have low supply to support all society with existing power plant. That is why this ongoing program which run by the goernment can fulfill needs of required electricity. In this case risk management have role to control EPC project of all power plant which currently being build.
In this research, it will elaborate the risk impact to the EPC power plant construction. Research method use are descriptive, qusionaire, and expert validation which align with questionaire that being processed used SPSS software. Variabel used in this research are 54 risk variabel that happen during EPC process.
Result by doing this action acquaire 9 dominant variabel impact to EPC project power plant which consist 3 on engineering process, 2 variabel in procurement level, and 4 in cosntruction level, include also mitigation action to comprehend those risk. Result showed that risk mostly occurs during engineering and contruction process which explain that needs more control on those process to avoid any delay.

 File Digital: 1

Shelf
 T47963-Mohamad Ilman Hasya.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T47963
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 82 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T47963 15-18-558378897 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20454418
Cover