UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Structural equation modelling untuk kolaborasi tim proyek infrastruktur dengan kontrak rancang bangun di Indonesia = Structural equation modelling for infrastructure project team collaboration with design and build contract in Indonesia

Cahyo Edi Wibowo; Yusuf Latief, supervisor; Afrizal Nursin, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Pito Sumarno, examiner (Fakultas Teknik Universitas Indonesia, 2017)

 Abstrak

Pembangunan Jalan Layang Non Tol Kapt. Tendean ndash; Blok M ndash; Cileduk adalah salah satu proyek infrastruktur di Indonesia yang dilakukan oleh Pemerintah Provinsi DKI Jakarta dengan sistem kontrak Rancang Bangun dan pendanaannya berasal dari Anggaran Pengeluaran dan Penerimaan Daerah APBD. Namun dalam pelaksanaan proyek tersebut terdapat beberapa kendala yang salah satu diantaranya adalah kolaborasi Tim internal dan eksternal yang belum maksimal sehingga menimbulkan terjadinya construction waste.
Dalam penelitian ini dilakukan survey untuk mengidentifikasi pengaruh dan kepentingan dari masing-masing tim yang memiliki pengaruh dalam construction waste, dari hasil survey tersebut dilakukan analisis dengan menggunakan Structural Equation Modelling. Kemudian disusun sebuah pola hubungan kolaborasi tim yang sukses dalam mengurangi construction waste pada proyek Pembangunan Jalan Layang Non Tol Kapt. Tendean ndash; Blok M ndash; Cileduk.
Berdasarkan hasil penelitian ditemukan bahwa LSM/Masyarakat/Wartawan dan Instansi Pemerintah Daerah yang merupakan bagian dari stakeholder eksternal serta Logistik yang merupakan stakeholder internal sangat mempengaruhi dan memiliki kepentingan serta kekuatan yang paling dominan untuk mendorong pencapaian tujuan dari pengurangan terhadap construction waste pada proyek rancang bangun di Indonesia.

Non Toll Flyover construction Capt. Tendean Blok M Cileduk is one of the infrastructure projects in Indonesia are carried out by the Provincial Government of DKI Jakarta with Design and Build contract system and its funding comes from the Expenditure and Revenue Budget APBD. However, in the implementation of the project, there are several obstacles that one of them is Team internal and external collaboration is not maximized, causing the occurrence of construction waste.
In this research conducted a survey to identify the influence and interests of each team that has influence in construction waste, from these survey results analyzed by Structural Equation Modelling. Then compiled a pattern of relationships successful team collaboration in reducing construction waste in construction projects Non Toll Flyover Capt. Tendean Blok M Cileduk. Based on the results of the study are that a team of external influence on the project of construction waste.
Based on the result of the research, it is found that NGO Community Journalist and Local Government Institution which is part of external stakeholder and Logistic which is internal stakeholder deeply influences and has the most dominant interest and strength to push the achievement of goal from reduction of construction waste at design project in Indonesia.

 File Digital: 1

Shelf
 T47853-Cahyo Edi Wibowo.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T47853
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 179 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T47853 15-21-286623191 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20454556
Cover