UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis produktivitas dan biaya pekerjaan box girder di cp 102 pada proyek konstruksi mrt Jakarta = Analysis of productivity and cost structure of box girder works in cp 102 of mrt Jakarta project construction

Adi Rizky Saputra; Ayomi Dita Rarasati, supervisor; R. Jachrizal Sumabrata, examiner; Rully Andhika, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Pekerjaan Box Girder merupakan construction project dengan repetitive work activities. Dalam penelitian dilakukan dua analisa, yaitu analisa produktivitas dan biaya pada pekerjaan box girder CP 102 pada proyek MRT Jakarta. Penulisan ini akan membandingkan analisa biaya konstruksi dari produktivitas aktual yang sedang di kerjakan dilapangan dengan nilai kontrak, sehingga akan terlihat tingkat akurasi perkiraan biaya proyek yang telah dilakukan dan diajukan dalam dokumen kontrak dengan membandingkan perhitungan analisa harga satuan dengan menggunakan SNI 2008 dan Jurnal 2017 DKI Jakarta. Analisis yang dilakukan pada penelitian ini adalah untuk mempelajari penggunaan nilai produktivitas, nilai koefisien atau indeks dan harga satuan dan upah pada sebuah material, alat dan pekerja didalam analisa biaya pada pekerjaan box girder. Metode yang digunakan adalah studi kasus yang dilakukan di proyek pembangunan MRT Jakarta tersebut, Pengumpulan data dilakukan dengan wawancara dan pengumpulan dokumen yang tersedia dan mencatat langsung produktivitas aktual baik dari durasi pekerjaan, material dan tenaga kerja, kemudian dilakukan analisa terhadap data tersebut. Analisa dilakukan dengan membandingkan nilai kontrak pada pekerjaan box girder tersebut dengan hasil analisa biaya proyek menggunakan SNI 2008 dan Jurnal DKI Jakarta. Sehingga didapat perbandingan Analisa Biaya Konstruksi antara nilai kontrak dengan biaya proyek berdasarkan SNI 2008 serta Jurnal 2017 DKI Jakarta terhadap tingkat akurasi perkiraan biaya proyek yang telah diajukan pada proyek MRT Jakarta.

ABSTRACT
he work of Box Girder is a construction project with repetitive work activities. In the research, there were two analyzes, namely productivity and cost analysis on CP 102 box girder works on Jakarta MRT project. This writing will compare the analysis of construction costs of actual productivity that is being done in the field with the value of the contract, so that will see the level of accuracy of project cost estimates that have been done and filed in the contract document by comparing the calculation of unit price by using SNI 2008 and Jurnal 2017 DKI Jakarta . The analysis done in this research is to study the use of productivity value, coefficient value or index and unit price and wage on a material, tool and worker in cost analysis at box girder work. The method used is a case study conducted in the Jakarta MRT development project. The data collection is done by interviewing and collecting the available documents and recording the actual productivity both from the duration of work, materials and labor, then analyzing the data. The analysis is done by comparing the contract value on the girder box job with the result of project cost analysis using SNI 2008 and Jurnal DKI Jakarta. So as to get comparison of Analysis of Construction Cost between contract value with project cost based on SNI 2008 and Jurnal 2017 DKI Jakarta to accuracy level of project cost estimation which have been proposed at Jakarta MRT project.

 File Digital: 1

Shelf
 S67572-Adi Rizky Saputra.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S67572
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xxiii, 157 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S67572 14-19-376167378 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20457022
Cover