Implementasi program inspeksi berbasis risiko dan penentuan sisa usia pada jalur pipa uap pembangkit listrik tenaga panas bumi (PLTP) unit A Kamojang menggunakan metode API 581 = Implementation of risk based inspection program and pipeline remaining life measurement on the steam pipeline in geothermal power plant (GPPs) unit A Kamojang using API 581 method
Yodi Saputro;
Nasruddin, supervisor; Nanang Kurniawan, examiner; Yudan Whulanza, examiner; Farizal, examiner
(Fakultas Teknik Universitas Indonesia, 2017)
|
|
| Jenis Koleksi : | UI - Skripsi Membership |
| No. Panggil : | S68053 |
| Entri utama-Nama orang : | |
| Entri tambahan-Nama orang : | |
| Program Studi : | |
| Subjek : | |
| Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2017 |
| Bahasa : | ind |
| Sumber Pengatalogan : | LibUI ind rda |
| Tipe Konten : | text |
| Tipe Media : | unmediated ; computer |
| Tipe Carrier : | volume ; online resource |
| Deskripsi Fisik : | xvii, 91 pages : illustration ; 28 cm + appendix |
| Naskah Ringkas : | |
| Lembaga Pemilik : | Universitas Indonesia |
| Lokasi : | Perpustakaan UI, Lantai 3 |
| No. Panggil | No. Barkod | Ketersediaan |
|---|---|---|
| S68053 | 14-19-186871911 | TERSEDIA |
| Ulasan: |
| Tidak ada ulasan pada koleksi ini: 20457065 |