UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Proses produksi kapal pelat datar ukuran 13.5 meter = Flat hull ship production process size 13.5 meters

Husnoel; Hadi Tresno Wibowo, supervisor; Muhammad Arif Budiyanto, supervisor; Agus Sunjarianto Pamitran, examiner; Firman Ady Nugroho, examiner (Fakultas Teknik Universitas Indonesia, 2017)

 Abstrak

Kebutuhan Indonesia sebagai negara kemaritiman akan perkembangan dan kemajuan dibibang kemaritiman khususnya dibidang teknologi perkapalan memicu para ilmuan indonesia untuk mengembangkan teknologi perkapalan. Kapal pelat datar merupakan hasil pengembangan riset dibidang teknologi perkapalan yang dilakukan oleh salah satu dosen Teknik Perkapalan Universitas Indonesia yaitu Ir. Hadi Tresno Wibowo. Kapal pelat datar memiliki keunggulan dalam hal proses produksinya yang cepat, mudah dan menghemat banyak cost production. Kelebihan dalam bidang produksi itulah yang membuat teknologi kapal pelat datar ini sangat mungkin untuk diproduksi secara massal untuk masyarakat bahari indonesia, dari alasan itulah penulis mencoba meneliti dengan mempelajari lebih lanjut mengenai proses produksi kapal pelat datar pada perusahaan pembuat kapal pelat datar ukuran 13.5 meter sehingga dapat menghasilkan sebuah sistem produksi kapal pelat datar yang dapat diproduksi secara sistematis dalam waktu 52 hari kerja. Sehingga dapat digunakan sebagai rujukan dalam produksi kapal pelat datar selanjutnya.

Indonesia 39 s need as a maritime country for the development and progress in maritime ships especially in the field of shipbuilding technology has trigger Indonesian scientists to develop shipbuilding technology. Flat hull ship is the result of research development in the field of shipbuilding technology conducted by one lecturer of Shipping Engineering University of Indonesia that is Ir. Hadi Tresno Wibowo. Flat hull ship has the advantage in terms of its production process is fast, easy and save a lot of cost production. The advantages in the field of production that makes this flat plate technology is very possible to be mass produced for the maritime community of Indonesia, from the reason that the author tries to research by learning more about the process of producing flat plates on shipbuilding companies so as to produce a flat plate production system that can be produced systematically within 52 working days. So it can be used as a reference in the production of the next flat plate vessel.

 File Digital: 1

Shelf
 S67241-Husnoel.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S67241
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 53 pages : illustration ; 30 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S67241 14-19-827817225 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20457469
Cover