UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Penentuan prioritas program preservasi jalan berdasarkan nilai IRI di jalan nasional DKI Jakarta: studi kasus: Jalan Daan Mogot, Jalan Ciputat Raya, Jalan Kartini, dan Jalan Tb. Simatupang = Priority determination of road preservation program based IRI value on national road DKI Jakarta: case study: Daan Mogot Street, Ciputat Raya Street, Kartini Street, and Tb. Simatupang Street

Rizqa Fadilla Hikmah; Tangkudung, Ellen Sophie Wulan, supervisor; Heddy Rohandi Agah, supervisor; Nahry, examiner; Sigit Pranowo Hadiwardoyo, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Program preservasi adalah kegiatan penanganan jalan, berupa pencegahan, perawatan, dan perbaikan untuk mempertahankan kondisi jalan agar tetap berfungsi optimal melayani lalu lintas, dilakukan setiap setahun sekali di semester awal. Skripsi ini bertujuan untuk menentukan prioritas preservasi jalan nasional di DKI Jakarta. Ruas jalan nasional yang dipilih adalah Jalan Daan Mogot, Jalan Ciputat Raya, Jalan Kartini, dan Jalan TB.Simatupang sebagai studi kasus. Menggunakan data sekunder yaitu nilai IRI, volume lalu lintas, dan jenis preservasi jalan. Data diolah menggunakan program SPSS 23 dengan uji asumsi klasik regresi yaitu uji normalitas residual, uji multikolinieritas, uji heteroskedasitas, uji korelasi pearson, dan analisis regresi linier berganda. Diperoleh persamaan keterkaitan antara nilai IRI dengan volume lalu lintas dan jenis preservasi jalan untuk setiap ruas jalan. Prioritas preservasi jalan nasional tersebut berdasarkan nilai IRI dari yang besar ke yang kecil yaitu Jalan TB.Simatupang prioritas pertama, Jalan Ciputat Raya prioritas kedua, Jalan Kartini prioritas ketiga, dan Jalan Daan Mogot prioritas keempat.

ABSTRACT
Preservation program is activity of prevention, maintenance, and repair needed to preservation road condition to keep functioning optimally to serve the traffic and conducted once a year in early semester. The final report aims to determine the priority of national road preservation. The selected national roads are Daan Mogot Street, Ciputat Raya Street, Kartini Street, and TB.Simatupang Street as case study. Using secondary data that is the value of IRI, traffic volume, and type of road preservation. Data processed using SPSS 23 program with classical regression assumption test such as residual normality test, multicolliniearity test, heteroskedasitas test, pearson correlation test, and multiple linier regression analysis. Model is obtained between the value of IRI with traffic volume and type of road preservation for each road segment. The priority of the national road preservation is based on the value of IRI from the big to the small one, namely TB.Simatupang Street first priority, Ciputat Raya Street second priority, Kartini Street third priority, and Daan Mogot Street fourth priority.

 File Digital: 1

Shelf
 S69427-Rizqa fadilla hikmah .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S69427
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 57 pages : illustration ; 29 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S69427 14-19-347366935 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20459356
Cover