UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis pemilihan skema pembiayaan infrastruktur jaringan gas kota di Indonesia dengan metode value for money (VfM) kuantitatif = Analysis of financing scheme selection for city gas network infrastructure in Indonesia with quantitative value for money method / Mohammad Badrus Soleh

Mohammad Badrus Soleh; Leni Sagita Riantini, supervisor; Andre Permana, supervisor; Yusuf Latief, examiner; Ayomi Dita Rarasati, examiner; Eddy Subianto, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Pembangunan infrastruktur jaringan gas kota untuk rumah tangga di Indonesia saat ini dilakukan melalui penunjukan langsung kepada BUMN migas dengan pembiayaan dari anggaran APBN tanpa melalui uji Value for Money VfM dan analisa risiko. Penelitian ini dilakukan untuk mengetahui risiko-risiko beserta dampaknya terhadap kinerja biaya Life Cycle Cost LCC proyek serta untuk mengetahui besaran nilai VfM pada pembiayaan proyek infrastruktur antara skema pembiayaan 100 APBN PSC dengan skema KPBU melalui uji Value for Money kuantitatif pada contoh studi kasus proyek jargas kota di Prabumulih Sumatera Selatan. Hasil penelitian menunjukan bahwa proyek tersebut memiliki 3 tiga faktor risiko dominan terhadap kinerja biaya LCC proyek serta skema KPBU merupakan skema pembiayaan yang dapat menghasilkan nilai penghematan sebesar 21 terhadap LCC proyek apabila dibandingkan dengan PSC 100 APBN.

ABSTRACT
City gas network infrastructure for households in Indonesia is currently developed through direct appointment to state owned oil and gas company with financing from state budget APBN without going through Value for Money VfM test risk analysis. This research conducted to obtain risks and impact of project life cycle cost LCC performance and to obtain the VfM between 100 state fund PSC financing scheme and Public Private Partnership PPP scheme through quantitative value for money test with a case study of the city gas network project in Prabumulih South Sumatra. The results show that the project has 3 three dominant risk factors againts the project LCC performance and the PPP scheme can generate saving of LCC cost of 21 when compared to PSC 100 state fund .Keywords City gas network for households Project financing scheme Value for Money.

 File Digital: 1

Shelf
 T49178-Mohammad Badrus Soleh.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T49178
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xxii, 98 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T49178 15-19-631408155 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20467299
Cover