Evaluasi sistem manajemen mutu perencanaan gedung Bank X berbasis resiko = The evaluation of quality management system building design of Bank X office based risk / Ratih Tri Utami

Ratih Tri Utami; Mohammed Ali Berawi, supervisor; Yusuf Latief, examiner; Setyo Supriyadi Sipadi, examiner; Rully Andhika, examiner ([Publisher not identified] , 2018)

 Abstrak

ABSTRAK
Proyek konstruksi merupakan kegiatan industri yang dilakukan di industri perbankan. Sistem manajemen mutu pekerjaan perencanaan gedung di Bank X belum disusun berbasis risiko, padahal erat kaitannya antara risiko dengan keberhasilan dalam pencapaian sasaran proyek, termasuk di dalamnya sasaran mutu. Penelitian ini menggunakan data primer dan sekunder dari arsip dan kuesioner yang dianalisa menggunakan gap analysis serta qualitative risk analysis untuk mendapatkan level risiko dari faktor risiko yang berasal dari setiap kegiatan dalam perencanaan gedung Bank X. Dari hasil analisa risiko diperoleh 7 tujuh peristiwa risiko dominan yang memiliki level risiko moderate pada pekerjaan perencanaan gedung standar baru yang terbagi dalam dua kategori risiko dan berdasarkan hasil pemetaan risiko pada masing-masing kategori risiko diketahui akar permasalahan, dampak, serta tindakan yang tepat untuk mengatasi risiko-risiko dominan tersebut. Akan tetapi, terdapat beberapa tindakan preventif maupun korektif yang belum diterapkan atau diimplementasikan ke dalam sistem manajemen mutu perencanaan gedung yang ada.

ABSTRACT
The construction project is an indutrial activities which is hel by the banking industry. The quality management system of the building planning work in a risk based Bank X has not yet been prepared, but closely related to the risk to the success in achieving the objectives of the project, including quality objectives. This study uses primary and secondary data from the archives and the questionnaires were analyzed using gap analysis and qualitative risk analysis to get the risk level of the risk factors derived from any activity in the planning of buildings Bank X. From the result of risk analysis, there are 7 seven dominant risk events that have moderate risk level in new standard building planning work divided into two risk categories and based on risk mapping result in each risk category known root of problem, impact, and appropriate action to overcome such dominant risks. However, there are some preventive and corrective actions that have not been implemented or implemented into existing building planning quality management systems.

 File Digital: 1

Shelf
 T50499-Ratih Tri Utami .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T50499
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2018
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 249 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T50499 15-19-828721592 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20475525
Cover