Penggunaan skema project financing dalam proyek pembangunan bendungan besar (studi kasus bendungan Karian) = Project financing scheme in development of dam project study case: Karian dam / Teuku Nevo Emerald Mahmud

Teuku Nevo Emerald Mahmud; Leni Sagita Riantini, supervisor; Eddy Subiyanto, supervisor; Ayomi Dita Rarasati, examiner; M. Ichsan Damiat, examiner; Setyo Suprijadi, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Pembangunan bendungan besar membutuhkan biaya investasi yang besar. Kebutuhan akan bendunganpun terus meningkat setiap waktunya. Hal ini mendorong tumbuhnya kebutuhan alternatif pembiayaan untuk pembangunan bendungan besar. Penelitian ini bertujuan untuk menganalisa Apasaja potensi ekonomis bendungan yang dapat menarik kalangan investor serta kelayakan ekonomis yang harus dimiliki bendungan untuk dikatakan layak investasi serta skema Kerjasama Pemerintah-Badan Usaha KPBU seperti apa yang tepat untuk digunakan dalam pembangunan bendungan sehingga melalui studi kasus bendungan Karian dapat dilihat bagaimana bila diterapkan skema tersebut. Untuk mendapatkan potensi ekonomi bendungan yang dilakukan pembahasan dari data sekunder dan dipertajam dengan pendekatan resiko untuk mengetahui variabel yang dominan berpengaruh terhadap pembangunan bendungan dengan skema kerjasama. Dari hasil matrik probabilitas dan dampak dilakukan kajian rekayasa ekonomi untuk mendapat kelayakan dari bendungan Karian. Hasil penelitian menunjukan bahwa bendungan karian memiliki potensi ekonomi yang baik dengan potensi penghematan APBN hingga 80 . Sesuai dengan kajian literature skema KPBU yang paling sesuai dengan skema pembiayaan bendungan adalah kontrak konsesi.

ABSTRACT
Construction of large dams require large investment costs. The need for the dam continues to increase every time. This encourages the growth of alternative financing requirements for the construction of large dams. This study aims to analyze anything what economic potential of dams to attract investors as well as the economic feasibility must be owned dams to be feasible investment and schemes Partnerships Enterprises KPBU as what is appropriate for use in the construction of the dam so that through case studies dam Karian it can be seen how when applied to the scheme. To get the economic potential of the dam conducted discussion of secondary data and sharpened risk approach to determine which variables are the dominant influence on the construction of a dam with the cooperation scheme. From the results of the probability and impact matrix engineering study done to obtain economic feasibility of the dam Karian. The results showed that the dam Karian has good economic potential with potential savings of up to 80 of the state budget. In accordance with the study of literature KPBU scheme that best suits the financing scheme dam was the concession contract.

 File Digital: 1

Shelf
 T50253-Teuku Nevo Emerald Mahmud.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T50253
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : x, 203 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T50253 15-19-718116492 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20475568
Cover