UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis risiko dan business continuity plan pada studi kasus : flood di pt x = Risk analysis and business continuity plan case study : flood pt x

Adi Gadang Wiratmoko; Zulkifli Djunaidi, supervisor; Dadan Erwandi, examiner; Indri Hapsari, examiner; Devie Fitri Octaviani, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018)

 Abstrak

Nama : Adi Gadang WiratmokoProgram Studi : Magister Keselamatan dan Kesehatan KerjaJudul : Analisis Risiko dan Business Continuity Plan pada StudiKasus : Flood di PT XPembimbing : Dr. dr. Zulkifli Djunaidi, M.App.ScPT X merupakan perusahaan yang bergerak dalam bidang penyediaan danpelayanan air bersih, dalam menjalankan operasional bisnisnya PT X sangatberisiko mengalami kerugian finansial maupun non finansial jika terjadi interupsikhususnya bencana alam, dalam studi kasus tesis ini adalah bencana banjir, untukitu PT X telah menyusun rencana keberlangsungan bisnis untuk menghadapibencana banjir.Analisis dilakukan dengan metode kualitatif, dengan melakukan diskusi kelompokorganisasi dan observasi dokumen untuk mengkaji penerapan analisis risiko danbusiness continuty plan, studi kasus : Banjir di PT X. Pemenuhan rencanakeberlangsungan bisnis business continuity plan dilakukan simplifikasi hanyapada tahapan Planning dan Do Implementation berdasarkan standar ISO 22301:2014 business continuity management system .Hasil penelitian menunjukkan bahwa dari aspek penilaian risiko, PT X telahmelakukan identifikasi risiko, analisis risiko, evaluasi risiko dan pengendalianrisiko dengan baik, namun belum dilakukan monitor, review dan update secaraberkala terhadap risk register dan analisis dampak bisnis. Hirarki pengendalianberupa rekayasa engineering belum maksimal dan frame of thingking futures riskpada proses identifikasi risiko belum dilakukan. PT. X telah merencanakan sumberdaya yang dibutuhkan pada saat terjadi bencana dengan baik dicerminkan daripemenuhan semua klausul ISO 22301 : 2014 pada tahapan planning danimplementation, namun masih adanya inkonsistensi pada beberapa klausul,penilaian sumber daya belum disesuaikan dengan perubahan kondisi risiko sertakondisi lingkungan terbaru pada implementasi business continuity plan.Kata kunci: analisis risiko, business continuity plan, ISO 22301 : 2014.

Name Adi Gadang WiratmokoStudy Program Occupational Health SafetyTitle Risk Analysis and Business Continuity Plan Case Study Flood PT XCounsellor Dr. dr. Zulkifli Djunaidi, M.App.ScPT X is a company in the sector supply and service of clean water, in operatingbusiness, PT X very risky financial and non financial loss if the occurrence ofinterruptions, In the study of the thesis case it was a disaster of flood. For whichPT X have been drawing up and developed a business continuity plan to facedisasters flood.The analysis was conducted by qualitative method, by conducting organizationalgroup discussions and document observation to assess the application of an analysisof risks and business continuty plan, case study flood in PT X. The fulfillment ofsustainability plan business, business continuity plan done simplification only onstage planning and implementation based on the iso standard 22301 2014 business continuity management system .The research results show that of the aspect of risk assessment, PT X haveidentified risk, an analysis of risks, evaluation risks and control risk well, but hasnot done monitoring, review and updating periodically to risk register and BusinessImpact Analysis. Control hierarchy of engineering has and frame of thingkingfutures risk in process of risk identification has not been done yet. PT. X hasplanned the required resources in the event of a disaster well reflected from thefulfillment of all clauses of ISO 22301 2014 at the planning and implementationstage, but inconsistencies in some clauses and resource appraisals have not beenadjusted to changes in risk conditions, and the latest environmental aspects on theimplementation of business continuity plan ..Keywords risk analysis, business continuity plan, ISO 22301 2014

 File Digital: 1

Shelf
 T50204-Adi Gadang Wiratmoko .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T50204
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 96 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T50204 15-22-49341784 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20477521
Cover