UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisa faktor-faktor penyebab terjadinya keterlambatan tindakan operasi delay to operation di instalasi rawat darurat RSUP Sanglah Desember 2017-Februari 2018 = Analysis of factors causing delay to operation in emergency department sanglah hospital December 2017-February 2018

Gede Eka Rusdi Antara; Amal Chalik Sjaaf, supervisor; Adik Wibowo, examiner; I Made Darmajaya, examiner; Kurnia Sari Setio Putri, examiner; Kurnia Sari, examiner; I Gede Made Arnata, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018)

 Abstrak

ABSTRAK
Nama : Gede Eka Rusdi AntaraProgram Studi : Kajian Administrasi Rumah SakitJudul : Analisa Faktor-Faktor Penyebab Terjadinya Keterlambatan Tindakan Operasi Delay To Operation di Instalasi Rawat Darurat RSUP Sanglah Desember2017-Februari 2018Pembimbing : Prof. dr. Amal Chalik Sjaaf, SKM, Dr.PHPelayanan pembedahan merupakan pelayanan kesehatan di rumah rumah sakit yang dapatmenggambarkan mutu rumah sakit. Peningkatan jumlah kunjungan, ketersediaan sarana danprasarana, ketersediaan sumber daya manusia serta lamanya waktu yang diperlukan untukmemperoleh persetujuan untuk tindakan operasi dari pasien dan keluarga dapat menyebabkanwaktu tunggu tindakan operasi menjadi panjang.Penelitian ini menggunakan rancangan mix method yaitu kuantitatif dan kualitatif. Penelitiankuantitatif merupakan penelitian observasional analitik cross sectional. Penelitian ini melibatkan54 responden pada penelitian kuantitatif dan 7 informan pada penelitian kualitatif.Hasil penelitian menunjukkan kejadian bed block sebanyak 38,9 dan tidak terjadi bedblock61,1 . Persetujuan operasi diperoleh dalam waktu ge; 1 jam dari 17 responden 31,5 danpersetujuan operasi yang diperoleh dalam waktu < 1 jam sebanyak 37 responden 68,5 . Alatdan sarana didapatkan tidak lengkap 5,6 dan lengkap 94,4 . Waktu tunggu tindakan operasiyang ge; 5 jam dikategorikan delay sebanyak 33,3 , waktu tunggu tindakan operasi yang < 5 jamdikategorikan tidak delay sebanyak 66,7 . Analisis bivariat dengan Chi Square menunjukkanpvalue 0,000 untuk hubungan antara bed block dengan keterlambatan operasi, p-value 0,000 untukhubungan antara persetujuan operasi dengan keterlambatan operasi, p-value 0,012 hubungan alatdan sarana dengan keterlambatan operasi. Faktor yang paling berpengaruh adalah persetujuanoperasi dengan p-value 0,005 dengan regresi logistik.Dari penelitian ini dapat disimpulkan adanya hubungan yang signifikan antara bed block,persetujuan operasi serta alat dan sarana terhadap keterlambatan operasi. Hasil penelitian ini dapatdijadikan pedoman dalam penyusunan strategi peningkatan kualitas pelayanan pembedahan diInstalasi Rawat Darurat.Key words: bed block, sumber daya manusia, persetujuan operasi, alat dan saranaoperasi, keterlambatan tindakan operasi

ABSTRACT
Name Gede Eka Rusdi AntaraProgramme Kajian Administrasi Rumah SakitTitle Analysis of Factors Causing Delay to Operation in Emergency DepartmentSanglah Hospital December 2017 February 2018Supervisor Prof. dr. Amal Chalik Sjaaf, SKM, Dr.PHSurgery is part of medical services that summarized the hospital performance. Increased hospitalvisits, unavailability of tools, unavailability of human resources, and times consumed to get patientagreement for surgery may causing delay to operation.This is mix method study, quantitative and qualitative. The quantitative study is observationalanalytic, cross sectional. This study includes 54 respondents in quantitative study and 7 informantsin qualitative study.The result showed bed block events is 38,9 . Agreement following informed consent is obtainedin ge 1 hour for 17 respondents 31,5 and 1 hour for 37 respondents 68,5 . Tools andequipment are complete and available in 94,4 cases and incomplete in 5,6 cases. Timeconsumed waiting for operation is categorized delay if ge 5 hours in 33,3 cases, categorized notdelay if 5 hours in 66,7 . Bivariate analysis using Chi Square showed p value 0,000 forcorrelation between bed block and delay to operation, p value 0,000 for correlation between timeconsumed to obtain agreement for surgery, p value 0,012 for correlation between tools andequipment with delay to operation. The most influencing factor is operation agreement with pvalue0,005 using logistic regression.From this study, we conclude there is significant correlation between bed block, time consumedfor obtain operation agreement, tools and equipment availability with delay to operation. Thisresult is a base in making strategy to improve quality of surgery services in emergency department.Key words bed block, human resources, operation agreement, tools and equipment, delay tooperation

 File Digital: 1

Shelf
 T-Gede Eka Rusdi Antara.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiv, 57 pages : illustration ; 29 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-19-418611505 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20477542
Cover