Pengelolaan Risiko pada Proyek Pembangunan Infrastruktur Lokasi Pemboran Panas Bumi untuk Meningkatkan Kinerja Waktu (Studi Kasus: PT X) = Risk Management in Infrastructure Development of Geothermal Drilling Location Project to Improve theTime Performance

Revanza Adirama Anwar; Leni Sagita Riantini, supervisor; Eddy Subiyanto, supervisor; Yusuf Latief, examiner; Ayomi Dita Rarasati, examiner; Hari Gumuruh Soeparto, examiner ([Publisher not identified] , 2015)

 Abstrak

ABSTRAK
Proyek pembangunan infrastruktur lokasi pemboran panas bumi, dalam pelaksanaannya tidak selalu baik yang ditunjukkan dengan terjadinya keterlambatan. Oleh karena itu perlu dilakukan manajemen risiko, yaitu dengan melakukan identifikasi risiko-risiko pada pelaksanaan proyek pada PT. X yang berpengaruh pada kinerja waktu proyek serta melakukan analisa dampak dan penyebabnya. Penelitian ini mengidentifikasi 5faktor risiko dominan yang memiliki pengaruh signifikan terhadap kinerja waktu proyek. Kelima faktor risiko dominan ini dikelompokkan menjadi dua komponen besar yaitu faktor risiko yang berhubungan dengan kondisi lokasi proyekdan faktor risiko yang berhubungan finansial kontraktor.Hasil dari analisa tersebut dievaluasi untuk menentukan level dan peringkat masing-masing risiko sehingga dapat ditentukan cara penanganan, tindakan dan rekomendasi terhadap risiko-risiko tersebut. Diharapkan dengan dilakukan proses manajemen risiko, maka kinerja waktu proyek PT. X dapat ditingkatkan sehingga tidak ada lagi terjadi keterlambatan proyek.

ABSTRACT
Delays in completing the infrastucture development of geothermal drilling projects sometimes inevitably occured due to certain issues. In order to minimise the risk of the delays,a risk management should be implemented. In this study analysing the infrastructure project of PT. X, the management of risk was conducted by identifying risks affecting project time performance and analysing its causes and impacts. This study identified five dominant risk factors that have a significant correlation on time performance of the project. Fifth dominant risk factors are grouped into two major components, the risk factors associated with the project site conditions and the risk factors related financial contractor.The results of the analysisthenbe evaluated in order to determine the level and rank of each risk. Based on this evaluation, treatments, actions, and recommendations could next be taken to resolve the risks. By implementing risk manegement, therefore, it is expected that time performance of PT. X project could be improved and any potential delays could be anticipated.

 File Digital: 1

Shelf
 T52017-Revanza Adirama Anwar.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T52017
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 155 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T52017 15-21-450895828 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20480320
Cover