UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Perancangan indikator green public procurement pada rest area tol Trans-Jawa = Green public procurement indicator design in Trans-Java toll rest area

Wilang Satria Perdana; Fauzia Dianawati, supervisor; Yadrifil, examiner; M. Dachyar, examiner ([Publisher not identified] , 2019)

 Abstrak

ABSTRAK
Green Public Procurement (GPP) adalah suatu proses dimana otoritas publik berusaha untuk melakukan pengadaan barang, jasa, dan pekerjaan dengan dampak lingkungan yang berkurang sepanjang siklus hidupnya jika dibandingkan dengan fungsi yang sama dengan tanpa mengimplementasikannya. Konsep GPP diharapkan dapat meningkatkan kualitas penyedia fasilitas dengan kriteria yang ada secara berkelanjutan. Pemerintah terus mengevaluasi dan mengembangkan infrastruktur logistik dengan membangun berbagai sarana dan prasarana, salah satunya adalah dengan membangun ruas Tol Trans-Jawa dengan total panjang lebih dari 1000 kilometer. Ruas tol ini akan dilengkapi dengan 61 tempat istirahat (rest area) sepanjang jalan. Rest area pada ruas tol Indonesia dibagi menjadi 3 jenis dan tipe untuk kebutuhan yang berbeda-beda. Butuh pengembangan kriteria penyedia fasilitas rest area serta penilaian bagi penyedia fasilitas yang sudah ada. Pemilihan kriteria menggunakan metode AHP (Analytic Hierarchy Process) dan penilaian serta segmentasi menggunakan metode TOPSIS (Technique for Order of Reference by Similarity to Ideal Solution). Penggunaan AHP menghasilkan bobot kriteria dan subkriteria yang akan dibagi menjadi dua segmentasi yang dilakukan oleh narasumber. Metode TOPSIS menghasilkan penilaian untuk setiap penyedia fasilitas rest area serta urutan bagi setiap segmen. Hasil akhir dari penelitian berupa bobot terbesar dari kriteria dan subkriteria serta segmentasi dan pengembangan bagi setiap penyedia fasilitas.

ABSTRACT
Green Public Procurement (GPP) is a process where public authorities seek to source goods, services, or works with a reduced environmental impact if compared to the same system that using the common process. GPP concept are expected to uptake the quality of the vendors sustainably. Indonesias government is still evaluating and improving logistic infrastructure by building various infrastructure, with building Trans-Jawa toll road, with a total distance more than 1000 kilometers. This toll road will be added with 61 rest areas along the road. Rest areas in Indonesias toll road are divided into three types depending on the needs of themselves. It is needed to improve the criteria of the rest areas vendors and assessment of the existing vendors. Criteria selection using AHP (Analytic Hierarchy Process) method and assessment and segmentation using TOPSIS (Technique for Order of Reference by Similarity to Ideal Solution) method. AHP method will provide weight for each criterion and subcriterion that will be divided into two segmentations constructed by the interviewees. TOPSIS method will provide assessment for each rest area supplier and sequence for each segment. Final results from the research are the largest weight from the criteria and subcriteria also segmentation and improvement for supplier.

 File Digital: 1

Shelf
 S-Wilang Satria Perdana.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2019
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvi, 100 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-20-702842246 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20490030
Cover