Pengembangan manajemen kontrak sebagai alat pengendalian kenaikan harga material pada proyek pembangkit listrik = Development of contract management to control material price increment in a power plant project

Muhamad Rangga Barmana; Ayomi Dita Rarasati, supervisor; Yusuf Latief, examiner; Afrizal Nursin, examiner; Leni Sagita Riantini, examiner (Fakultas Teknik Universitas Indonesia, 2019)

 Abstrak

Proyek pembangkit listrik merupakan proyek yang kompleks dan mahal. Oleh karena itu, proyek ini memiliki risiko yang tinggi terutama untuk proyek dengan jenis kontrak jenis kontrak enjiring, pengadaan dan konstruksi (EPC). Dalam proyek-proyek ini, perusahaan kontraktor sering mengalami cost overrun yang disebabkan oleh kenaikan harga material dalam beberapa item utama pekerjaan yang dikerjakan oleh pemasok atau subkontraktor. Studi ini bertujuan untuk mengendalikan biaya proyek dengan mengembangkan manajemen kontrak dan mengidentifikasi faktor-faktor risiko. Analisa deskriptif dan analisa risiko dilakukan untuk mengidentifikasi risiko yang dominan. Respon risiko kemudian dikembangkan dan terintegrasi dalam proses manajemen kontrak. Hasil dari Studi ini menunjukkan bahwa ada 38 faktor risiko yang menyebabkan kenaikan harga material pada proyek pembangkit listrik di Indonesia, di antaranya 10 dominan, dan beberapa aspek menjadi dikembangkan dari respon risiko terhadap risiko dominan dan didapatkan 14 aktivitas pengembangan untuk prosedur eksisting administrasi subkontrak dan prosedur perolehan kontrak pengadaan barang dan jasa. Risiko yang mempengaruhi kenaikan harga material sebagian besar terjadi selama fase perencanaan dan strategi di awal kontrak pembentukan.

Power plant projects are complex and expensive; therefore, the risks will be high especially for engineering, procurement and construction (EPC) fixed price contract projects. In these projects, the contracting company often experiences cost overrun caused by material price increment in several major items of work carried out by them pemasoks or subcontractors. This study aims to control project costs by developing contract management and identifying risk factors. Descriptive and qualitative risk analysis was conducted to identify the dominant risks. Risk responses are then developed and integrated within the contract management processes. The results of this study show that there are 38 risk factors causing material price increment in power plant projects, among which 10 are dominant, and several aspects to be developed through 14 risk responses for existing contract administration procedure and contract aquisition for goods and services procedure. The risk that affects material price increment the most occurs during the planning and strategy phase at the beginning of the contract formation.

 File Digital: 1

Shelf
 T54101-Muhamad Rangga Barmana.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T54101
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2019
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 119 pages : illustration ; 28 cm + appendi
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T54101 15-21-596435422 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20490370
Cover