Penilaian risiko keselamatan kerja pada proses pemasangan (erection) baja di proyek pembangunan stasiun Light Rail Transit (LRT) oleh PT X tahun 2019 = Occupational safety risk assessment on the steel erection process of light rail transit station construction project by PT X 2019

Dewi Ashari Ciptaningrum; Zulkifli Djunaidi, supervisor; Chandra Satrya, examiner; Mushanif Mukti, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019)

 Abstrak

Kecelakaan konstruksi terjadi karena pekerjaan konstruksi mengandung risiko dan bahaya yang tinggi. Terutama dalam pekerjaan ereksi baja di proyek-proyek pembangunan Stasiun Light Rail Transit (LRT), di mana para pekerja dihadapkan pada kondisi seperti bekerja pada ketinggian, melibatkan alat berat dan peralatan tajam, kondisi cuaca panas, dan durasi kerja yang panjang. Untuk menghindari kecelakaan pada pembangunan stasiun LRT, penilaian risiko diperlukan pada proses kerja ereksi.
Penelitian ini bertujuan untuk menentukan tingkat risiko keselamatan kerja dalam proses kerja ereksi baja di proyek pembangunan stasiun LRT oleh PT X dengan mengacu pada metode analisis risiko semi-kuantitatif AS/NZS ISO 31000: 2009 tentang Manajemen Risiko. Desain penelitian dilakukan dengan studi observasional dan pendekatan analisis deskriptif.
Dari hasil penelitian, dapat dilihat bahwa risiko tertinggi pekerjaan ereksi baja adalah jatuh, bertabrakan dengan bahan baja, komponen terjepit peralatan ereksi, dan kelelahan karena durasi kerja yang panjang. Kontrol yang disarankan termasuk menyediakan manlift untuk pekerja, menambah persediaan APD, menyediakan sistem hadiah & hukuman untuk pekerja, dan mengoptimalkan pengawasan oleh penyelia, manajer HSE, konsultan pengawas, dan kementerian perhubungan.

Construction accidents occur because construction works carry high risks and hazards. Especially in steel erection work in Light Rail Transit Station (LRT) construction projects, where workers are faced with conditions such as; work at height, involving heavy equipment and sharp equipment, hot weather conditions, and long work duration. To avoid accidents at the LRT station construction, risk assessment is needed in the erection process.
This study aims to determine the level of work safety risks in the steel erection work process in the LRT station construction project by PT X with reference to the AS / NZS ISO 31000: 2009 semi-quantitative risk analysis method on Risk Management. The research design was carried out with observational studies and descriptive analysis approaches.
From the results of the study, it can be seen that the highest risk of steel erection work is falling, colliding with steel materials, components being squeezed by erection equipment, and fatigue due to long work duration. Suggested controls include providing manlift for workers, increasing PPE inventory, providing a reward & punishment system for workers, and optimizing supervision by supervisors, HSE managers, supervisory consultants, and the ministry of transportation.

 File Digital: 1

Shelf
 S-Dewi Ashari Ciptaningrum.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvii, 229 pages : illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-pdf 14-21-425959012 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20491442
Cover