https://access.unram.ac.id/wp-content/

UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Analisis Asuhan Keperawatan Pada Pasien Gagal Jantung Dan Intervensi Perencanaan Pulang = Analysis of Nursing Care in Heart Failure Patients and Discharge Planning Interventions

; Hanny Handiyani, supervisor; Masfuri, examiner; Euis Trisriyarti, examiner ([Publisher not identified] , 2019)

 Abstrak

ABSTRAK
Pelaksanaan perencanaan pulang pada pasien gagal jantung atau Congestive Heart Failure (CHF) belum optimal di Indonesia sementara perencanaan pulang pada pasien gagal jantung penting dilakukan secara optimal. CHF merupakan salah satu dari penyakit kardiovaskuler yang penting bagi kita diketahui penatalaksanaannya yang optimal karena perkembangan CHF progresif dengan angka mortalitas dan mordibitas tinggi. Perencanaan pulang yang dilakukan dengan optimal dapat meningkatkan kapasitas fungsional, penguatan psikologi pasien dan tidak adanya rawat inap berulang dalam 30 hari setelah pemberian perencanaan pulang. Studi kasus ini bertujuan untuk mendeskripsikan proses perencanaan pulang yang optimal pada Ny H yang dirawat selama 4 hari. Pemberian perencanaan pulang optimal yang dilakukan pada Ny H menghasilkan perbaikan hemodinamik, pasien menjadi lebih tenang dan kooperatif. Rekomendasi penulisan ini adalah agar perawat melakukan perencanaan pulang pada pasien CHF untuk mengoptimalkan perawatan pasien CHF selama dirawat.

ABSTRACT
The implementation of Discharge Planning for heart failure patients or Congestive Heart Failure (CHF) is not optimal in Indonesia while Discharge Planning for patients with heart failure is important to do optimally. CHF is one of cardiovascular diseases which is important for us to know its optimal management because of the progressive development of CHF with high mortality and mortality. Optimal Discharge Planning can improve functional capacity, strengthen patient psychology and avoid repeated hospitalizations within 30 days after giving Discharge Planning. This case study aims to describe the optimal Discharge Planning process for Ms. H who was treated for 4 days. Provision of optimal return planning carried out in Ny H results in improved hemodynamics, patients become more calm and cooperative. The recommendation of this paper is for nurses to do discharge planning for CHF patients to optimize the care of CHF patients during treatment.

 File Digital: 1

Shelf
 PR-pdf-Reni Rahmawati.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2019
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xi, 59 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-21-685620383 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20491697
Cover