UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisa sistem manajemen mutu pada konstruksi jalan tol PT. Marga Sarana JaBar: studi kasus jalan tol Bogor ring road = Analysis of quality management system implementation in toll road construction:c ase study: Bogor ring road toll road

Manggala Kusumo Wijayanto; Anton Wachidin, supervisor; Arvianssyah, examiner; Lily Sudhartio, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018)

 Abstrak

Salah satu cara untuk memeratakan ekonomi di Indonesia adalah dengan cara membangaun infrastruktur salah satunya jalan tol. Jalan tol menjadi salah satu Proyek Strategis Nasional (PSN) untuk mengkoneksi seluruh bagian Indonesia dari mulai pedesaan hingga kota. PT.Marga Sarana Jabar merupakan salah satu bagian dari PSN yang menkoneksi bagian luar Bogor ke arah Jakarta (Ibukota Indonesia), Sukabumi dan Balaraja. Jalan tol harus memberikan kenyamanan pada setiap penggunanya baik dari segi kemacetan, kerusakan jalan dan hal hal lainnya yang menyebabkan ketidak nyamanan. Salah satu penyebab utama ketidak nyamanan tersebut datang dari penerapan kualitas ketika pada saat konstruksi jalan tol tidak diterapkan sesuai dengan standar. Sistem Manajemen Kualitas (SMM) pada saat konstruksi dapat memudahkan pengawas dalam memonitor pekerjaan kontraktor. Akan tetapi, terdapat beberapa masalah didalam penerapan SMM di PT.MSJ. Riset ini menggunakan data primer dan sekunder baik dari dokumen proyek maupun wawancara. Analisa kualitatif ini juga didukung dengan alat yang digunakan yaitu Nvivo 12. Kesimpulan dari riset ini adalah sumber daya manusia merupakan faktor penting didalam buruknya penerapan SMM. Pentingnya pelatihan untuk sumber daya manusia dibutuhkan untuk meningkatkan kualitas konstruksi.

One of the ways for Indonesia to gain economic equity is by building toll road. Toll road becomes one of the National Strategic Projects (Proyek Strategis Nasional - PSN) of Indonesia to connect all areas expanding from the suburbs to the cities. PT. Marga Sarana Jabar is one of them, connecting Bogor outer ring road area to Jakarta, Sukabumi and Balaraja. Toll road operator must provide a comfortable road trip to the users. They have to minimize any of congestions, damaged roads, or other inconveniences. One of the root causes of any inconveniences comes from the quality that delivered during toll road construction did not comply to the standards. Quality Management System (QMS) during construction can ease the supervisor to monitor the quality. However, there were troubles during the implementation of QMS in construction. This research uses primary and secondary data obtained from archive and questionnaires. The method of analysis using qualitative analysis that also supported with Nvivo tools to identify the highest possibility factors causing poor quality. The main conclusion of this research is that human resource is significantly affecting to the success implementation of QMS. Appropriate training of human resource will be immensely required to improve the construction quality.

 File Digital: 1

Shelf
 T55030-Manggala Kusumo Wijayanto.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T55030
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 99 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T55030 15-21-257533351 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20503815
Cover