Pengembangan kamus dan checklist berbasis WBS (Work Breakdown Structure) pada proyek konstruksi pelabuhan laut untuk perencanaan estimasi biaya = Development of dictionary and checklist based on WBS (Work Breakdown Structure) at sea port project construction for cost estimation planning

Alifa Amalia Ilmi; Fadhilah Muslim, supervisor; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner (Fakultas Teknik Universitas Indonesia, 2020)

 Abstrak

Sebuah proyek konstruksi terdiri dari banyak kegiatan. Agar lebih mudah dikelola, kegiatan dibagi menjadi lebih kecil yang disebut paket pekerjaan. Sementara pekerjaan pada proyek konstruksi dan unsur-unsurnya relatif sama dan ini dapat di standardisasi dan digunakan sebagai dasar untuk program universal untuk pekerjaan konstruksi. Standarisasi WBS akan memungkinkan otomatisasi proses perencanaan proyek dan karenanya akan meminimalkan terjadinya kesalahan manajemen biaya pada proyek. Tujuan dari penerapan ini adalah untuk mengembangkan standar kamus dan checklist berbasis WBS untuk perencanaan estimasi biaya pada pekerjaan pelabuhan laut, mengidentifikasi sumber yang berpotensi dapat berdampak pada cost overrun suatu proyek. Metode penelitian ini menggunakan metode survei kepada para pakar pelabuhan laut untuk mengetahui standar kamus dan checklist berbasis WBS. Survei divalidasi oleh para pakar sebagai dasar dalam pengembangan standar kamus dan checklist WBS. Diharapkan penelitian ini dapat menjadi acuan standar kamus dan checklist berbasis WBS pada proyek konstruksi pelabuhan laut untuk perencanaan estimasi biaya.


A construction project consists of many activities. To be more easily managed, activities are divided into smaller called work packages. The elements of construction project work are relatively similar, and these can be standardized and used as a basis for a universal program for construction project. The WBS standards can be developed into a dictionary and checklist that will help the project planning process and is expected to minimize the occurrence of cost management errors on the project. The purpose of this research is to develop a dictionary and checklist standard based on Work Breakdown Structure (WBS) for planning cost estimates for seaport project construction, identifying sources that can potentially have an impact on a project's cost overrun. This research method uses a survey method to seaport expert’s validation and interviews using questionnaires to find the WBS-based dictionary and checklist standards. This research is expected to be a standard reference dictionary and checklist based on Work Breakdown Structure (WBS) at seaport construction projects for cost estimation planning.

 File Digital: 1

Shelf
 S-Alifa Amalia Ilmi.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2020
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xviii, 172 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-22-40209016 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20505044
Cover