Analisis Metode Konstruksi Balanced Cantilever dengan Form Traveler System pada Segmental Box Girder Jembatan Sungai Ogan = Analysis of the Balanced Cantilever Construction Method with the Form Traveler System in the Segmental Box Girder of the Ogan River Bridge

Ressa Adrian Bernessa; Muhammad Salman, supervisor; Aldy Riza Dhiandra, supervisor (Fakultas Teknik Universitas Indonesia, 2020)

 Abstrak

Jalan Tol Kayu Agung–Palembang–Betung atau Jalan Tol Kapalbetung adalah megaproyek infrastruktur jalan tol sepanjang 111,6 kilometer dari Kayu Agung hingga Betung. Jalan tol ini merupakan bagian dari Jalan Tol Trans Sumatra dan pembangunannya diperkirakan menelan biaya sekitar Rp 7-8 triliun. Pembangunannya dilaksanakan PT Waskita Sriwijaya Tol selaku Badan Usaha Jalan Tol (BUJT), hingga Juni 2020 sudah sepanjang 42 kilometer dikerjakan, dari Kayu Agung sampai Palembang dengan waktu pelaksanaan dimulai dari 1 Juni 2016.
Jembatan Ogan merupakan merupakan satu dari tiga jembatan bentang panjang yang ada di Ruas Tol Kayu Agung – Palembang. Jembatan ini memiliki total panjang 1,6 kilometer dengan lebar bentang utama 385 meter, clearance horizontal 185 meter dan clearance vertikal 16,5 meter. Nilai investasi jembatan adalah Rp1,2 triliun.
Jembatan Ogan merupakan jembatan segmental box girder yang didirikan di atas sungai Ogan yang sampai saat ini masih aktif dan masih dilewati oleh kapal dan ponton di Sumatera Selatan. Dengan minimum tinggi bersih jembatan setinggi 75 meter, dan supaya tidak mengganggu lalu lintas di Sungai Ogan, sehingga metode balanced cantilever dengan form traveler system merupakan metode yang tepat.

Kayu Agung - Palembang - Betung Toll Road or Kapalbetung Toll Road is a mega project. 111,6 kilometers of toll road infrastructure is builded from Kayu Agung to Betung. This toll road is part of the Trans Sumatra Toll Road and its construction is estimated to cost around Rp. 7-8 trillion. The construction was carried out by PT Waskita Sriwijaya Toll as the Toll Road Business Entity (BUJT), up to June 2020, 42 kilometers have been worked on, from Kayu Agung to Palembang with the implementation time starting from June 1, 2016.
Ogan Bridge is one of three long span bridges in the Kayu Agung - Palembang Toll Road Section. This bridge has a total length of 1.6 kilometers with a main span width of 385 meters, horizontal clearance of 185 meters and vertical clearance of 16.5 meters. The investment value of the bridge is IDR 1.2 trillion.
Ogan Bridge is a segmental box girder bridge which was erected on the Ogan River which is still active and still being passed by ships and pontoons in South Sumatra. With a minimum bridge height of 75 meters high, and so as not to disturb traffic on the Ogan River, so the balanced cantilever method with the form traveler system is the right method.

 File Digital: 1

Shelf
 PR-pdf-Ressa Adrian Bernessa.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2020
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 63 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-21-708632054 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20506541
Cover