UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengendalian erosi pada Area Reklamasi Pertambangan Batubara (Suatu Studi di PT. X, Kebupaten Kapuas, Provinsi Kalimantan Tengah) = Erosion Control in Coal Mining Reclamation (A Case Study in PT. X, Kapuas District, Central Kalimantan Province). ;Faktor-Faktor yang Berhubungan dengan Kejadian Anemia pada Remaja di Provinsi Terpilih Sumatera (Analisis Data Indonesia Family Life Survey Tahun 2014) = Associated Factors with Incidence of Anemia in Adolescent in Selected Province of Sumatera (Analysis of Indonesia Family Life Survey Data of 2014)

Arief Adi Pradana; Dwi Nowo Martono, supervisor; Soemarno Witoro Soelarno, supervisor; Bambang S. Lautt, examiner; Ginting Jalu Kusuma, examiner (Sekolah Ilmu Lingkungan Kajian Ilmu Lingkungan, 2020)

 Abstrak

Riset ini dilaksanakan dikarenakan adanya permasalahan tidak sesuainya antara prediksi laju erosi dengan kondisi aktual laju erosi pada salah satu area reklamasi PT. X. Tujuan riset ini adalah untuk mengurangi dampak erosi pada kegiatan reklamasi pertambangan PT. X. Metode riset ini dilakukan dengan menggunakan perhitungan laju erosi dengan USLE, perhitungan Indeks Bahaya Erosi (IBE) penilaian keberhasilan reklamasi, wawancara dengan masyarakat desa disekitar PT. X, perhitungan nilai ekonomi akibat erosi dengan valuasi ekonomi dengan menggunakan Nilai Ekonomi Total (NET) dan wawancara kepada ahli dibidang K3 dan reklamasi tambang untuk menentukan tingkat risiko dan prioritas pengendalian erosi. Hasil penelitian ini menunjukkan faktor penyebab erosi yang paling dominan faktor penyebab erosi yang berpengaruh pada laju erosi adalah faktor P dengan perhitungan laju erosi dengan pendekatan USLE sebesar 35.351,69 ton/ha/tahun dan nilai Indeks Bahaya Erosi (IBE) dengan kategori Sangat Tinggi mendominasi area reklamasi dengan persentase 61,11%. Hasil penilaian keberhasilan reklamasi menunjukkan bahwa baru 2 dari 8 area reklamasi yang memiliki nilai diatas nilai minimum 80 dan tidak ada hubungan yang signifikan antara IBE terhadap nilai keberhasilan reklamasi namun ada hubungan signifikan dan berbanding terbalik antara IBE dengan parameter pengendalian erosi dan sedimentasi. Hasil perhitungan NET adalah Rp13,7 milyar/tahun dan prioritas utama dalam pengendalian erosi dari hasil judgement para ahli dari tingkat risiko rendah-sangat tinggi adalah kriteria efektivitas dengan jenis pengendalian erosi yaitu pengaturan kemiringan lereng sesuai standar geoteknik.

This research was carried out due to the mismatch between the predicted erosion rate and the actual condition of the erosion rate in one of the reclamation areas of PT. X. The purpose of this research is to reduce the impact of erosion on the mining reclamation activities of PT. X. This research method is carried out by using the calculation of the rate of erosion with USLE, the calculation of the Erosion Hazard Index (IBE) for the success of reclamation assessment, interviews with village communities around PT. X, calculation of economic value due to erosion using Total Economic Value (NET) and interviews with experts in the field of K3 and mine reclamation to determine the level of risk and priority for erosion control. The results of this study indicate that the most dominant factor causing erosion that affects the rate of erosion is the P factor with the calculation of the erosion rate using the USLE approach of 35,351.69 ton/ha/ year and the Erosion Hazard Index (IBE) value in the Very High category dominates. Reclamation area with a percentage of 61.11%. The results of the reclamation success assessment show that only 2 out of 8 reclamation areas have a value above the minimum value of 80. There is no significant relationship between IBE and the reclamation success value. However, there is a significant and inversely proportional relationship between IBE with erosion and sedimentation control parameters. The result of the calculation of NET is Rp13.7 billion/year and the main priority in erosion control from the results of the judgment of experts from the low-very high-risk level is the effectiveness criteria with the type of erosion control, namely setting the slope according to geotechnical standards.

 File Digital: 1

Shelf
 T-Arief Adi Pradana.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Sekolah Ilmu Lingkungan Kajian Ilmu Lingkungan, 2020
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : 80
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-81007262 TERSEDIA
T-pdf TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20506891
Cover