UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis dan Metode Konstruksi Sambungan Basah untuk Komponen Pelat-Pelat dan Pelat-Balok Beton Pracetak pada Struktur Rumah Sakit XYZ = Analysis and Construction Method for Wet Connection Slab-Slab and Slab-Beam of Precast Concrete in XYZ Hospital Structure

Fernaldy Fochen; Jessica Sjah, supervisor; Ayomi Dita Rarasati, supervisor; Heru Purnomo, examiner; Sjahril A. Rahim, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Konstruksi di Indonesia dapat mengalami peningkatan pesat apabila metode beton pracetak dapat diterapkan secara luas. Salah satu faktor utama kegagalan dalam konstruksi dengan metode beton pracetak adalah permodelan dan pelaksanaan sambungan antar komponen pracetak yang belum sempurna. Penelitian ini akan menganalisis, mendesain, dan merencanakan metode konstruksi sambungan basah beton pracetak pelat-pelat dan pelat-balok pada struktur Rumah Sakit XYZ. Berdasarkan studi kasus Rumah Sakit XYZ, sambungan pada penyaluran tekan memiliki tipe sambungan tanpa kait, sedangkan sambungan pada penyaluran tarik memiliki variasi tipe berupa sambungan penyaluran tanpa kait, tipe sambungan dengan kait 90°, dan tipe sambungan dengan kait 180°. Metode pengangkatan yang digunakan dalam proses instalasi komponen pelat pracetak adalah pengangkatan dengan 4 titik angkat pada permukaan komponen pelat pracetak.

Construction in Indonesia could be improved if precast concrete methods were widely applied. One of the main factors of failure in the construction with precast concrete methods is the modeling and implementation of joints between precast components that are not yet perfect. This study will analyze, design, and plan precast concrete construction methods of precast concrete wet connection slab-slab and slab-beam for XYZ Hospital Structure. Based on the case study of XYZ Hospital, the compressive reinforcement has a hookless type of joint reinforcement, while the distribution of tensile reinforcement has a variety of types, namely the non-hooked connection reinforcement type, the 90 degrees hook joint reinforcement type, and the 180 degrees hook joint reinforcement type. The lifting method used in the precast plate component installation process is the 4-point lifting on the surface of the precast plate component.

 File Digital: 1

Shelf
 S-Fernaldy Fochen.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xxii, 204 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-pdf 14-22-34595482 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20513539
Cover