Metode Pelapisan pada Pekerjaan Lanjutan Perpanjangan Runway dari 1.200 X 30 menjadi 1.630 X 30, Pelapisan Taxiway dan Apron Bandar Udara Sibisa - Parapat = Overlay Methods on Extension of Runway from 1200 X 30 to 1630 X 30, Overlay Taxiway and Apron in Airport Of Sibisa - Parapat

Simanjuntak, Murydrischy Panatap; Muhammad Salman, supervisor; Sutrasno Kartihardjono, examiner; Pardede, Makmur, supervisor (Fakultas Teknik Universitas Indonesia, 2020)

 Abstrak

Bandar udara Sibisa berada dekat lokasi objek wisata danau toba. Pengembangan bandar udara ini sangat penting untuk meningkatkan pembangunan infrastruktur demi perpindahan dari satu tempat ketempat lain, dan kondisi ini juga dapat mendukung peningkatan investor. Pada pengembangan bandar udara ini dilakukan pekerjaan lanjutan perpanjangan runway dari 1200 x 30 menjadi 1630 x 30. Perkerasan pada runway bermanfaat untuk memberikan daya dukung yang memadai untuk menahan beban pesawat. Dalam memenuhi kebutuhan tersebut, ketebalan perkerasan harus memenuhi kebutuhan beban yang telah direncanakan. Pelaksanaan pekerjaan pelapisan perkerasan, diperlukan beberapa proses. Proses atau tahapan pekerjaan sangat mempengaruhi efisiensi waktu yang akan mengakibatkan pekerjaan dapat selesai tepat waktu atau bahkan lebih cepat dari waktu yang telah diberikan oleh pihak owner. Pada pekerjaan ini dibutuhkan 70 hari kerja dalam pelaksanaan pelapisan asphalt concrete. Tahapan pada setiap kegiatan harus dilakukan secara paralel agar tidak ada pekerjaan yang tumpang tindih yaitu meliputi pekerjaan pembersihan menggunkan compressor, penyemprotan tack coat, pengehamparan asphalt concrete, dan pemadatan.

Sibisa Airport is near of Lake Toba. This airport development is very important to increase infrastructure for mobility, and this condition can also support the increase of investors. In the development of this airport, further work was carried out on the extension of the runway from 1200 x 30 to 1630 x 30. Overlay on the runway is useful to provide adequate carrying capacity to withstand aircraft loads. In these condition the overlay thickness havet ot follow the load requirements that have been planned. The implementation of overlay work requires several processes. The process or work stages greatly affect time efficiency which will result in work being completed on time or even faster than the time given by the owner. In this work, it takes 70 working days for the asphalt concrete. The stages of each activity must be carried out in parallel so there is no overlapping work, which includes cleaning work using a compressor, spraying tack coat, laying asphalt concrete, and compaction.

 File Digital: 1

Shelf
 PR-Murydrischy Panatap Simanjuntak.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2020
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 35 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-22-63275373 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20515262
Cover