UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Meningkatkan Standarisasi Manajemen Operasi Perusahaan Ontraktor pada Unsur Manajerial, Teknikal, dan Sertifikasi = Improving the Standardization of Contractor Company Operations Management on Managerial, Technical, and Certification Element

Rahmat Primadi; Sutrasno Kartohardjono, supervisor; Jaka Fajar Fatriansyah, examiner (Fakultas Teknik Universitas Indonesia, 2020)

 Abstrak

Dalam mencapai tujuan dan sasaran dari tugas seorang insinyur pasti memiliki sistem manajemen operasi yang terorganisir dengan baik. Tujuan dari penulisan ini adalah Mendapatkan pengelolaan sistem manajemen operasi yang tepat sasaran. Upaya evaluasi manajemen operasi proyek pada unsur pengelolaan kontrak berupa membuat Analisa Harga Satuan Pekerjaan, Analisa Teknis Satuan Pekerjaan, Daftar Kuantitas Harga, Metodologi dan Program Kerja. Upaya evaluasi Manajemen Proyek Memiliki sistem kerja terintegrasi melalui website. Memberikan solusi pada kegagalan struktur dengan cara pemadatan tanah dengan metode pelaksanaan vibro roller dan Dynamic Compaction. Kemudian stabilitas daya dukung tanah menambahkan lamestone, Subbase, dan Base Coarse. mengidentifikasi dan evaluasi dari keterlambatan pekerjaan dan ketidaktepatan perencanaan pengadaan material, tenaga, dan alat. Pembuatan master schedule dengan menambahkan faktor risiko didalamnya. Upaya evaluasi sertifikasi yaitu meregistrasi badan usaha sebagai jasa konstruksi terintegrasi sesuai dengan bidangnya sebagai kontraktor EPC design and build. Menambah tenaga ahli dan profesional struktur dan ME yang tersertifikasi oleh LPJK dan PII. Memiliki kerangka kerja perencanaan dan konstruksi yang tertuang pada prosedur pekerjaan. Meningkatkan pelatihan tenaga ahli dan profesional.

In achieving the goals and objectives of an engineer must have well-organized operation management. The purpose of this paper is to get the management of operating management that is right on target. Efforts to evaluate project operations management in contract management are creating a Work Unit Price Analysis, Technical Analysis for Work Units, List of Price Quantities, Methodology, and Work Program. Project Management evaluation efforts Have an integrated work through the website. Providing solutions to structural failures through soil compaction using the Vibro roller implementation method and Dynamic Compaction. Then the stability of the bearing capacity of the soil adds limestone, Subbase, and Base Course. Identify and evaluate the delays in work and inaccuracies in planning the procurement of materials, personnel, and tools. Making a master schedule by adding risk factors to it. The certification evaluation effort is to register a business entity as an integrated construction service following its field as an EPC design and build contractor. Adding structural experts and professionals and ME certified by LPJK and PII. Have a planning and construction framework contained in work procedures. Improve the training of experts and professionals.

 File Digital: 1

Shelf
 PR-Rahmat Primadi.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2020
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 55 pages : illustrations + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-22-04212861 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20515503
Cover