UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Evaluasi Keberlanjutan PLTGU Di Unit Pembangkit Tanjung Priok = Sustainability Evaluation of PLTGU in Tanjung Priok Power Unit

Adam Wicaksono; Ahyahudin Sodri, supervisor; Ellyna Chairani, supervisorUdi Syahnoedi Hamzah, examiner; Rachmadhi Purwana, examiner (Sekolah Ilmu Lingkungan Uiniversitas Indonesia, 2021)

 Abstrak

Pembangkit Listrik Tenaga Gas Uap (PLTGU) berperan penting dalam memenuhi kebutuhan listrik masyarakat. Namun, terdapat beberapa masalah seiring dengan perkembangan teknologi, perubahan lingkungan alam dan sosial yang dapat mempengaruhi keberlanjutan PLTGU. Oleh sebab itu, diperlukan kerangka evaluasi keberlanjutan PLTGU yang meliputi dimensi lingkungan, sosial dan ekonomi. Tujuan penelitian ini adalah untuk membuat model evaluasi keberlanjutan PLTGU dengan menggunakan pendekatan Triple Bottom Line dan menggunakan model tersebut untuk mengetahui tingkat keberlanjutan PLTGU. Penelitian ini menggunakan pendekatan kuantitatif dengan metode Life Cycle Assessment (LCA) dan Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan bahwa kinerja keberlanjutan PLTGU pada dimensi lingkungan, sosial dan ekonomi berturut turut adalah 39%, 19%, dan 17% dengan jumlah nilai 75%. Berdasarkan nilai pada ketiga dimensi tersebut, dapat disimpulkan bahwa kondisi keberlanjutan PLTGU Tanjung Priok berada pada kondisi sustainable.

Combined Cycle Power Generation (PLTGU) plays an important role in meeting the electricity needs of the community. However, there are several problems along with technological developments, changes in the natural and social environment that can affect the sustainability of the PLTGU. Therefore, a PLTGU sustainability evaluation framework is needed which includes environmental, social, and economic dimensions. The purpose of this study is to create a model for evaluating the sustainability of the PLTGU using the Triple Bottom Line approach and using this model to determine the level of sustainability of the PLTGU. This study used a quantitative approach with the method of Life Cycle Assessment (LCA) and Analytical Hierarchy Process (AHP). The results show that the sustainability performance of PLTGU on the environmental, social, and economic dimensions were 39%, 19%, and 17%, respectively, with a total score of 75%. Based on the scores for these three dimensions, it can be concluded that the sustainability condition of the Tanjung Priok PLTGU is in sustainable condition.

 File Digital: 1

Shelf
 T-Adam Wicaksono .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Sekolah Ilmu Lingkungan Uiniversitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xx, 116 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-22-63477569 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20516584
Cover