UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis implementasi proses manajemen risiko : studi kasus pada Lembaga Pemerintah XYZ = Analysis of risk management process implementation : case study at XYZ Government Agencies

Elisabeth Widyani Dwi Astuti; Tobing, Robert Porhas, supervisor; Chaerul D. Djakman, examiner; Tobing, Agustinus N.L., examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021)

 Abstrak

Penelitian ini bertujuan untuk menganalisis implementasi proses manajemen risiko pada lembaga pemerintah XYZ. Jenis penelitian yang digunakan pada penelitian ini merupakan penelitian kualitatif deskriptif dengan pendekatan studi kasus. Teknik pengumpulan data menggunakan analisis dokumen dan wawancara. Setiap organisasi akan menghadapi beberapa risiko dalam pencapaian tujuan. Studi kasus pada lembaga pemerintah XYZ dilakukan karena dihadapkan pada ancaman dan risiko yang sangat besar, baik eksternal maupun internal, sehingga diperlukan manajemen risiko organisasi. Oleh karena itu, lembaga pemerintah XYZ membutuhkan suatu manajemen risiko yang efektif untuk mencapai tujuan organisasi. Hasil pengukuran tingkat maturitas menggunakan kriteria atribut ERM Process Management pada RIMS RMM menunjukkan bahwa lembaga pemerintah XYZ berada pada tingkat “initial” dalam menerapkan proses manajemen risiko organisasi. Selain itu, penelitian ini memberikan rekomendasi yang relevan dalam penerapan proses manajemen risiko organisasi sekaligus sebagai peta jalan dalam meningkatkan tingkat maturitas proses manajemen risiko pada lembaga pemerintah XYZ.

This study aims to analyze and implement the risk management process at the XYZ government agency. The type of research used in this research is descriptive qualitative research with a case study approach. This research data collection techniques using document analysis and interviews. Every organization will face some risks in achieving its goals. The case study at the XYZ government agency was carried out as they are faced with huge threats and risks, both external and internal so the organizational risk management was needed. Therefore, government agency XYZ requires effective risk management to achieve organizational goals. The results of measuring the maturity level using the ERM Process Management attribute criteria at RIMS RMM indicate that XYZ agency is at the "initial" level in implementing the organizational risk management process. In addition, this study provides relevant recommendations in the application of organizational management processes as well as a roadmap in increasing the level of maturity of the risk management process in XYZ government agencies.

 File Digital: 1

Shelf
 T-Elisabeth Widyani Dwi Astuti.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 95 pages : illustrations + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-24729597 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20517433
Cover