Perencanaan keuangan strategis melalui analisis kinerja periode proyek percepatan infrastruktur kelistrikan 10.000 MW dan 35.000 MW pada PT PLN (Persero) = Financial strategic planning by analyzing performance throughout 10,000 MW and 35,000 MW electricity infrastructure acceleration project period at PT PLN (Persero)

Cynthia Roosaly Maryana; Imo Gandakusuma, supervisor; Maria Ulpah, examiner; Lubis, Arief Wibisono, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021)

 Abstrak

Sebagai pemegang izin usaha penyediaan tenaga listrik, PT PLN (Persero) wajib menyediakan tenaga listrik yang memenuhi standar mutu dan keandalan yang berlaku serta memberikan pelayanan sebaik-baiknya kepada konsumen dan
masyarakat mendukung pertumbuhan ekonomi, mendorong investasi, dan pemerataan industri. Untuk itu, Pemerintah Indonesia memberi tugas kepada PT PLN (Persero) untuk menjalankan program pembangunan infrakstruktur dalam
pencapaian rasio elektrifikasi nasional dalam bentuk proyek percepatan infrastruktur kelistrikan 10.000 MW dan dilanjutkan dengan 35.000 MW atau Mega Proyek. Pada dasarnya, penelitian ini mengidentifikasi faktor-faktor keuangan yang relevan selama proyek percepatan infrastruktur untuk menilai tingkat Kesehatan perusahaan dalam meneruskan Mega Proyek yang termasuk dalam Rencana Usaha Penyediaan Tenaga Listrik yang diterbitkan oleh Kementerian Energi dan Sumber Daya Mineral. Menggunakan mixed-method, kinerja keuangan perusahaan dianalisis menggunakan indikator tingkat kesehatan Keputusan Menteri No.100 tahun 2002. Faktor yang dapat mempengaruhi tingkat kesehatan keuangan perusahaan antara lain pendapatan usaha, porsi utang, kenaikan aset dan pengelolaan biaya adalah penting sebagai dasar formulasi perencanaan keuangan melalui laporan keuangan proforma.

PT PLN (Persero), as the only state-owned enterprise that holds the electricity supply business license in Indonesia, is required to implement government programs in achieving the national electrification ratio in the form of electricity infrastructure acceleration project which consist of 10.000 MW and followed by 35.000 MW or known as Mega Project in encouraging economic growth, investment and industrial equity. In substance, this study identifies relevant financial factors during the infrastructure acceleration project period to measure the company’s financial health in continuing the mega project which is included in Electricity Supply Business Plan issued by
the Ministry of Energy and Mineral Resources. Using mixed-method, we analyze the company’s financial health based on financial aspect health indicators issued by the Ministry of State-Owned Enterprises. Factors like sales growth, debt ratio, fixed asset ratio and cost management are evidently crucial to formulate strategic planning through pro forma financial statements in this case study.

 File Digital: 1

Shelf
 T-Cynthia Roosaly Maryana.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource (rdacarries)
Deskripsi Fisik : xiii, 56 pages ; Illustrations + appendix
Naskah Ringkas : 2022
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-84014252 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20518643
Cover