Strategi percepatan pengadaan tanah bagi pembangunan jalan di DKI Jakarta = Strategy for acceleration of land acquisition for road construction in DKI Jakarta.

Ebend Ferry Nobel; Ayomi Dita Rarasati, supervisor; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner; Rosmariani Arifuddin, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Kegiatan pengadaan tanah masih menjadi persoalan utama dalam percepatan penyediaan infrastruktur di Indonesia. Begitu juga pembangunan infrastruktur jalan di Provinsi DKI Jakarta yang berjalan lambat bahkan tidak tuntas. Proses pengadaan tanah dimulai dengan tahapan perencanaan, persiapan, pelaksanaan dan penyerahan hasil secara aktual dilaksanakan lebih lama dari jangka waktu yang ditetapkan. Identifikasi risiko dilakukan untuk mengetahui permasalahan yang ada pada setiap proses tahapan tersebut melalui wawancara langsung dengan acuan studi literatur. Setelah dikumpulkan faktor risiko yang memengaruhi keterlambatan proses pengadaan tanah, lalu faktor risiko diverifikasi oleh pakar kemudian ditanyakan pendapat responden dari stakeholder terlibat. Analisa risiko dilakukan untuk mengetahui faktor risiko yang dominan memengaruhi kinerja waktu pengadaan tanah. Melalui sebaran kuesioner, pendapat responden tentang tingkat dampak dan tingkat frekuensi diketahui sehingga dapat dilakukan analisa peringkat risiko dengan risiko tinggi. Peringkat risiko dengan risiko tinggi ditanggapi dengan respon risiko. Tindakan pencegahan dan tindakan perbaikan dalam respon risiko dapat digunakan sebagai strategi percepatan pengadaan tanah di Dinas Bina Marga.

Land acquisition activities are still the main problem in accelerating the provision of infrastructure in Indonesia. Likewise, the development of road infrastructure in the DKI Jakarta Province is running slowly and even incompletely. The land acquisition process begins with the stages of planning, preparation, implementation, and delivery of the actual results carried out longer than the stipulated time period. Risk identification is carried out to find out the problems that exist in each of these stages through direct interviews with reference to literature studies. After collecting the risk factors that affect the delay in the land acquisition process, then the risk factors are verified by experts and then asked the opinion of respondents from the stakeholders involved. Risk analysis was conducted to determine the dominant risk factors affecting the timing of land acquisition. Through the distribution of questionnaires, respondents' opinions about the level of impact and the level of frequency are known so that a risk rating analysis with high risk can be carried out. Risk ratings with high risk are responded to with a risk response. Preventive and corrective actions in risk response can be used as a strategy for accelerating land acquisition at Dinas Bina Marga.

 File Digital: 1

Shelf
 T-Ebend Ferry Nobel.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 163 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-53622023 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20519347
Cover