UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan risk management plan pada pelaksanaan proyek pembangunan saluran pembawa air baku karian–Serpong = Development of a risk management plan on the project implementation of the water karian-Serpong conveyance system.

Eko Wibowo; Leni Sagita Riantini, supervisor; Wisnu Isvara, supervisor; Ayomi Dita Rarasati, examiner; Rossy Armyn Machfudiyanto, examiner; Afrizal Nursin, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Proyek Pembangunan Saluran Pembawa Air Baku Karian – Serpong merupakan proyek pembangunan sarana pendukung dalam rangka pemenuhan kebutuhan air minum di Propinsi Banten dan DKI Jakarta. Saluran air ini mengalirkan air baku dari Bendungan Karian di Lebak Banten menuju Water Treatment Plan yang berada di Serpong Banten. Proyek saluran air ini memiliki kompleksitas yang tinggi sehingga dalam pelaksanaannya sangat membutuhkan perencanaan manajemen risiko yang baik agar pelaksanaan proyek bisa berjalan dengan baik dan tidak mengalami keterlambatan. Penelitian ini bertujuan untuk melakukan identifikasi risiko, menganalisa dampak dan respon risiko serta menyusunnya menjadi perencanaan manajemen risiko (Risk Manajemen Plan) sebagai dokumen pendukung dalam pelaksanaan pembangunan saluran air baku Karian – Serpong ini. Berdasarkan hasil penelitian didapatkan 9 (sembilan) faktor risiko dominan dimana faktor keterlambatan pengadaan tanah merupakan faktor risiko dengan level risiko tertingi. Berdasarkan hasil masukan dan verifikasi para Pakar akhirnya disusun suatu dokumen Risk Management Plan yang diharapkan bisa memberikan manfaat bagi kontraktor dalam mengelola risiko selama pelaksanaan proyek dan memberikan masukan kepada Kementerian Pekerjaan Umum dan Perumahan Rakyat untuk pelaksanaan proyek sejenis selanjutnya.

The Karian – Serpong water conveyance construction project is a project to build supporting facilities in order to meet drinking water needs in Banten Province and DKI Jakarta. This aqueduct carries raw water from the Karian Dam in Lebak Banten to the Water Treatment Plan in Serpong Banten. This waterway project has a high complexity so that in its implementation it really requires good risk management planning so that project implementation can run well and not experience delays. This study aims to identify risk, analyze the impact and risk response and compile it into a Risk Management Plan as a supporting document in the implementation of the Karian - Serpong raw water channel construction. Based on the results of the study, there were 9 (nine) dominant risk factors where the delay in land acquisition was the risk factor with the highest level of risk. Based on the results of the input and verification of the Experts, a Risk Management Plan document was finally prepared which is expected to provide benefits for contractors in managing risks during project implementation and provide input for the Ministry of Public Works and Public Housing for the implementation of similar projects in the future.

 File Digital: 1

Shelf
 T-Eko Wibowo.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 243 pages : illustration + appendix.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-37838287 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20522144
Cover