UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Evaluasi kematangan implementasi scrum framework dengan scrum maturity model dan rekomendasi perbaikan pada pengembangan produk HR di Perusahaan XYZ = Evaluation of scrum framework implementation using scrum maturity model and improvement recommendation for HR product development at PT XYZ

Farah Nabilah Muhammad; Petrus Mursanto, supervisor; Alex Ferdinansyah, supervisor; Kodrat Mahatma, examiner; Eko Kuswardono Budiardjo, examiner (Fakultas Ilmu Komputer Universitas Indonesia, 2022)

 Abstrak

Perusahaan XYZ merupakan perusahaan tech-based yang berfokus pada pembangunan solusi digital. Dengan adanya kebutuhan akan produk digital Human Resource (HR) dan pengalaman serta resources yang dimiliki, perusahaan membangun aplikasi PX. PX melakukan otomatisasi proses HR yang mencakup dari awal seseorang berstatus kandidat hingga karyawan yang ingin mengundurkan diri dari perusahaan. Pada pengembangan PX, digunakan Scrum sebagai framework dalam mengembangkan perangkat lunak. Implementasi Scrum pada pengembangan PX ternyata terdapat kendala yang menyebabkan target Sprint Backlog tidak tercapai sehingga menghambat penyelesaian employee journey PX. Pada identifikasi masalah menunjukkan bahwa salah satu akar permasalahnnya adalah praktik Scrum belum berjalan dengan baik. Oleh karena itu, penelitian ini melakukan pengukuran kematangan Scrum pada pengembangan produk PX dengan menggunakan Scrum Maturity Model yang acuannya telah diperbarui dari Scrum Guide 2010 menjadi Scrum Guide 2020. Peneliti menggunakan wawancara, studi dokumen, observasi, dan kuesioner sebagai instrumen penelitian. Penelitian menggunakan data kualitatif dan kuantitatif. Data kuantitatif diolah untuk menghasilkan tingkat kematangan Scrum dan data kualitatif digunakan sebagai data pendukung dalam memperkuat data kuantitatif. Hasil penelitian didapatkan bahwa Tim PX memperoleh tingkat kematangan satu (Initial). Setelah didapatkan hasil pengukuran, peneliti memberikan sasaran perbaikan untuk praktik wajib yang belum mendapatkan interpretasi Fully Achieved yaitu 15 praktik pada tingkat dua (Managed) dan 16 praktik pada tingkat tiga (Defined). Rekomendasi perbaikan disusun berdasarkan Scrum Guide 2020, SBoK v3, dan pendapat pakar Scrum eksternal. Hasil penelitian ini berupa dokumen rekomendasi perbaikan praktik yang telah divalidasi oleh praktisi Scrum di PX yaitu Product Owner. Dokumen ini dapat menjadi dasar perbaikan praktik Scrum pada Tim PX.

XYZ Company is a tech-based company that focuses on building digital solutions. With the need for Human Resource (HR) digital products and the experience and resources they have, the company builds the PX application. PX automates HR processes, from candidates to employees who want to leave the company. In PX development, Scrum is used as a framework for developing software. The implementation of Scrum in PX development turned out to have obstacles that caused the Sprint Backlog target not to be achieved, thus hampering the completion of the PX employee journey. The problem identification shows that one of the root problems is that Scrum practices have not been implemented well. Therefore, this study measures Scrum maturity in PX product development using the Scrum Maturity Model, whose reference has been updated from Scrum Guide 2010 to Scrum Guide 2020. Researcher used interviews, document studies, observations, and questionnaires as research instruments. The study used qualitative and quantitative data. Quantitative data is processed to produce Scrum maturity level and qualitative data is used as supporting data in strengthening quantitative data. The results showed that the PX Team obtained a maturity level one (Initial). After obtaining the measurement results, the researcher provides improvement targets for required practices that have not received a Fully Achieved interpretation, namely 15 practices at level two (Managed) and 16 practices at level three (Defined). Recommendations for improvement are based on the Scrum Guide 2020, SBoK v3, and the opinions of external Scrum experts. The results of this study are in the form of a practice improvement recommendation document that Scrum practitioners have validated at PX, namely the Product Owner. This document can be the basis for improving Scrum practices for the PX Team.

 File Digital: 1

Shelf
 TA-Farah Nabilah Muhammad.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2022
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvi, 134 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-22-95590355 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20522240
Cover