Pengembangan tingkat kematangan aset proses organisasi manajemen biaya untuk kesuksesan proyek pada perusahaan pengembang eksplorasi panas bumi di Indonesia = Development of cost management organizational process asset maturity level for project success in geothermal exploration development companies in Indonesia

Alimah Sekarningrum; Ayomi Dita Rarasati, supervisor; Mohammed Ali Berawi, examiner; Rosmariani Arifuddin, examiner; Mohammad Ichsan, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Indonesia diyakini memiliki potensi energi panas bumi sebesar 23.965 MW (Megawatt) atau setara dengan 20,28% dari potensi panas bumi dunia. Kondisi pemanfaatan panas bumi di Indonesia saat ini yaitu kapasitas terpasang sebesar 2.130,7 MW. Pengembangan panas bumi di Indonesia menemui banyak tantangan, dibuktikan salah satunya oleh pemanfaatannya yang rendah walaupun memiliki cadangan terbesar kedua di dunia. Pengembang panas bumi percaya bahwa salah satu faktor utama yang menghambat pengembangan panas bumi adalah tingginya risiko hulu. Salah satu faktor yang menghambat pengembangan panas bumi yaitu yang akan dibahas dalam penelitian ini adalah keterbatasan akses pada data pengeboran panas bumi menjadi kendala utama bagi setiap engineer atau peneliti pengeboran di Indonesia yang berupaya mencari cara untuk mengoptimalkan biaya pengeboran panas bumi. Dahulu biaya sumur di Indonesia jarang dipublikasikan, sehingga sulit dan tidak cukup data untuk dapat mengevaluasi biaya sumur hingga keyakinan statistik yang masuk akal. Perusahaan pengembang panas bumi di Indonesia tidak termotivasi untuk berbagi lesson learned dan best practice dari proyek pengeboran panas bumi ke publik, mengakibatkan kurangnya pengembangan terhadap aset proses organisasi yang dijadikan benchmarking untuk mengoptimalkan biaya eksplorasi. Dengan melakukan penilaian terhadap tingkat kematangan aset proses organisasi manajemen biaya proyek eksplorasi panas bumi diharapkan dapat mengetahui sudah sampai di mana tingkat kematangan saat ini dan diharapkan dapat memberikan strategi untuk dapat mengembangkan aset proses organisasi dalam manajemen biaya agar meningkatkan kesuksesan proyek. Penelitian ini dilakukan sebagai wujud pengembangan aset proses organisasi terhadap perencanaan biaya yang dapat dijadikan sebagai lesson learned berupa prosedur untuk perencanaan biaya proyek pengeboran industri panas bumi di Indonesia dan selanjutnya untuk meningkatkan keberhasilan pembangunan pembangkit listrik tenaga panas bumi di Indonesia.

Indonesia is believed to have geothermal energy potential of 23,965 MW (Megawatt) or equivalent to 20.28% of the world's geothermal potential. The current condition of geothermal utilization in Indonesia, in the form of installed capacity of geothermal power plants, is about 2,130.7 MW. Utilization of geothermal development in Indonesia faces many challenges, one of which is proven by its low utilization despite having the second largest reserves in the world. Geothermal developers believe that one of the main factors hindering geothermal development is the high upstream risk. One of the factors that hinder geothermal development, which will be discussed in this study, is the limited access to geothermal drilling data, which is a major obstacle for every drilling engineer or researcher in Indonesia who is trying to find ways to optimize geothermal drilling costs. In the past, well costs in Indonesia were rarely published, making it difficult and insufficient data to evaluate well costs to reasonable statistical confidence. Furthermore, geothermal development companies in Indonesia are not motivated to share lessons learned and best practices from geothermal drilling projects to the public, resulting in a lack of development of organizational process assets that are used as benchmarks to optimize exploration costs. By assessing the maturity level of project cost management's organizational process assets in geothermal exploration projects, it is expected to find out the current maturity level and provide a strategy to develop organizational process assets in project cost management in order to increase project success. This research was conducted as a form of developing organizational process assets towards cost planning that can be used as lessons learned in the form of procedures for cost planning for geothermal drilling projects in Indonesia and further to increase the success of geothermal power plant development in Indonesia.

 File Digital: 1

Shelf
 T-Alimah Sekarningrum.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2022
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xix, 238 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-22-76729905 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20525163
Cover