Re-Design Jetty Model In-Situ menjadi Model Precast = Re-Design Jetty In-Situ Model into Precast Model

Danang Adi Setiaji; Fitri Yuli Zulkifli, supervisor; Muhammad Salman, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Konstruksi Jetty merupakan item utama yang mendukung operasional PLTU. Namun, proses konstruksi Jetty pada umumnya dan khususnya di lokasi PLTU Sulut-1 menemui beberapa kendala dimana lokasi Jetty di pantai terbuka yang langsung menghadap Samudera Pasific dan Laut Cina Selatan (Philipina), sehingga ombak dan arus laut yang cukup besar akan sangat berpengaruh pada faktor kesulitan konstruksi Jetty dan target schedule yang berpotensi delay. Solusi yang dilakukan ialah dengan melakukan re-desain Jetty model konvensional in-situ menjadi model precast.
Hasil dari analisis perbandingan diperoleh hasil bahwa Jetty model Precast lebih mudah dikerjakan dan mampu menghemat durasi waktu pekerjaan sekitar 16-20%. Penerapan metode precast (pra-cetak) telah memenuhi aspek Lean Construction, sebab memiliki produktivitas lebih tinggi, durasi lebih cepat, dan meng-eliminasi pemborosan. Meskipun demikian, Jetty model precast juga memiliki kekurangan dimana volume rebar yang diperlukan lebih besar 8% dibanding metode konvensional in-situ. 

Jetty construction is the main item that supports PLTU/CFSPP operations. However, the process of Jetty construction in general and especially at the PLTU Sulut-1 location encountered several obstacles where the location of the Jetty on open coast that directly faces the Pacific Ocean and the South China Sea (Philippines), so that the waves and sea currents quietly large and will affect to Jetty construction become highly difficulties and potentially delay target schedule. Therefore, the solution is to re-design conventional in-situ Jetty model into precast model.
The results of the comparison analysis show that the Jetty Precast model become more easily to construct and faster to save the duration of work around 16-20%. The application of the precast method has fulfilled the Lean Construction aspect, because it has higher productivity, faster duration, and eliminates waste. However, the Jetty precast model also has dis-advantage which the rebar quantity is 8% more than the conventional in-situ method. 

 File Digital: 1

Shelf
 PR-Danang Adi Setiaji.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2022
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 43 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-23-15674620 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20526452
Cover