Strategi Pengendalian Risiko Bagi Badan Usaha Untuk Meningkatkan Kinerja Waktu Pelaksanaan Pekerjaan Rancang Bangun Proyek Pekerjaan Penggantian dan/atau Duplikasi Jembatan Callender Hamilton = Risk Control Strategy for Private Sector to Improve Time Performance of Design and Build of The Callender Hamilton Bridge Replacement and/or Duplication Project

Andika Pratama; Ayomi Dita Rarasati, supervisor; Leni Sagita Riantini, examiner; Rosmariani Arifuddin, examiner; Mohammad Ichsan, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Proyek konstruksi jembatan merupakan salah satu contoh dari sekian banyak proyek konstruksi. Sama halnya dengan proyek konstruksi lainnya, jika manajemen risiko tidak dipertimbangkan dalam proyek konstruksi jembatan, tujuan proyek tidak dapat dicapai tepat waktu, sesuai anggaran, atau dengan kualitas hasil yang sesuai. Tujuan dari penelitian ini adalah mengidentifikasi risiko serta mengembangkan strategi pengendalian bagi risiko dominan pekerjaan rancang bangun bagi badan usaha untuk mengoptimlkan pelaksanaan pekerjaan rancang bangun proyek penggantian dan/atau duplikasi jembatan callender hamilton. Penelitian ini dilaksanakan dengan mengumpulkan data melalui validasi pakar dan survei kuesioner. Kemudian data diolah menggunakan metode statistik untuk dianalisis deskriptif dan kemudian dilanjutkan dengan analisis risiko kualitatif guna mendapatkan risiko dominan yang berpengaruh terhadap kinerja waktu proyek. Hasil dari analisis risiko kualitatif didapatkan sebanyak 13 risiko dominan bagi badan usaha yang berpengaruh terhadap kinerja waktu proyek. Sebanyak 28 tindakan preventif dan 24 tindakan korektif sebagai strategi pengendalian risiko yang dapat dilakukan oleh badan usaha untuk meningkatkan kinerja waktu proyek.

The bridge construction project is one example of many construction projects. As with any other construction project, if risk management is not considered in a bridge construction project, the project objectives cannot be achieved on time, within budget, or with the appropriate quality of results. The purpose of this study is to identify risks and develop control strategies for the dominant risks of the design and construction phase for private sector to improve time performance of design and build of the callender hamilton bridge replacement and/or duplication project on the island of Java. This research was conducted by collecting data through expert validation and questionnaire survey. Then the data is processed using statistical methods for descriptive analysis and then followed by a qualitative risk analysis in order to obtain the dominant risk that affects the project time performance. The results of the qualitative risk analysis obtained as many as 13 dominant risks for business entities that affect project time performance. A total of 28 preventive actions and 24 corrective actions as risk control strategies that can be carried out by business entities to improve project time performance.

 File Digital: 1

Shelf
 T-Andika Pratama.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2022
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xviii, 168 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-09878846 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20526859
Cover