Jalan Tol diselenggarakan dengan tujuan untuk meningkatkan efisiensi pelayanan jasa distribusi serta efisiensi dana Anggaran Pendapatan dan Belanja Negara (APBN). Pemeliharaan Jalan Tol adalah salah satu kegiatan untuk menjaga kondisi permukaan jalan dan fasilitasnya sesuai standard. Dilingkungan PT Jasa Marga (persero), pekerjaan ini ditangani secara bersama oleh unit Pemeliharaan kantor pusat sebagai pembina dan unit Pemeliharaan kantor Cabang yang akan melaksanakannya. Sedangkan kontraknya didasarkan pada Jadwal. Harga satuan dan perkiraan volume yang dikerjakan, dan pembayarannya dilaksanakan setelah pengukuran pekerjaan selesai (Harga satuan tetap-Fixed Unit Price). Namun dalam pelaksanaannya masih dilakukan secara parsial berdasarkan jenis pekerjaan, lokasi dan kerusakan sesuai kondisinya. Kondisi ini dinilai tidak efisien, balk dari segi administrasi yang memerlukan waktu lama maupun dari segi teknis yang memerlukan pengawasan dengan sumberdaya manusia yang lebih banyak.
Untuk mengatasi hal tersebut ditempuh strategi pengadaan dengan sistem Kontrak Pemeliharaan berdasarkan Kinerja atau sering dikenal dengan istilah Performance Base Maintenace Contract (PBMC), dimana untuk suatu proyek pemeliharaan, kontrak didasarkan atas kemampuan kontraktor dalam mempertahankan kondisi minimum yang telah tercantum dalam kontrak dan bukan terhadap volume pekerjaan yang telah diselesaikan. Sifat kontrak PBMC ini adalah mengalokasikan tanggung jawab dalam desain dan pelaksanaan pekerjaan secara efisien dan efektif sepenuhnya tergantung pada kontraktor. Pengalaman di beberapanegara-menunjukkan bahwa sistem ini memiliki banyak keuntungan yang salah satunya adalah menurunkan biaya pemeliharaan serta dapat memperbaiki kondisi jalan yang diinginkan.
Namun demikian masih dimungkinkan terjadinya ketidakpastian yang dapat mengakibatkan tidak tercapainya sasaran yang diinginkan. Maka dengan pendekatan Risk Assesment, dapat diidentifikasi risiko-risiko yang mungkin timbul, yang selanjunya dengan Proses Hirarki Analisis (Analytic Hierarchy Process) dapat diketahui bobot masing-masing kriteria risiko yang berpengaruh terhadap penerapan PBMC pada pemeliharaan Jalan tol.

The Toll road carried out as a mean to improve distribution service activities efficiency and also General Revenues and Expenditure Budget fund (APBN) efficiency. Toll Road Maintenance is one of the activities to take care of the condition of road surfaces and its facility according to standard. In Jasa Marga's environment, this work handled collectively by Maintenance Division of head office as builder and Maintenance unit of branch office to executing it. While its contract is relied on Schedule, Unit Price and Estimate of done volume, and its payment executed after measurement of work finish. However, in its execution still conducted by partial pursuant to work type, damage and location according to its condition. This condition assessed is inefficient, either from administration facet needing old time or also from technical facet, which need observation with human being source, which is more.
To overcome mentioned gone through levying strategy with system Contract Conservancy pursuant to Performance or often recognized with Performance Base Maintenance Contract (PBMC) term, for the maintenance project, contract based to the ability of contractor in maintaining the condition of minimum which have been contained in bond and non to work volume which have been finished. Nature of this PBMC contract is responsibility allocation in work execution and design efficiently fully depends at contractor. Experience in some country show that the system have many advantage which one of them is to degrade maintenance cost and also can improve the condition of wanted road.
However, that way still enabled by the happening of uncertainly able to result not reach of wanted target. Hence with approach of Risk Assessment, earn risk identification which possible arise, what its with Analytic Hierarchy Process can know by Wight of each risk criterion having an effect on to applying of PBMC at toll road maintenance.

 File Digital: 1

Shelf
 Risk assessment-TOC (T8811).pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T8811
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2003
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : ix, 65 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T8811 15-17-350712347 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 72541
Cover