Pengaruh kualitas faktor keselamatan dan kesehatan kerja terhadap kinerja waktu penyelesaian proyek konstruksi bangunan tinggi di JABOTABEK = The influence of health and safety factor quality to high rise building project construction time performance in JABOTABEK

Eko Triaji; Ismeth Abidin, supervisor; Wisnu Isvara, supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Pekerjaan konstruksi merupakan kompleksitas yang melibatkan material konstruksi, peralatan konstruksi, metode konstruksi, biaya konstruksi, tenaga kerja yang dapat menjadi sumber potensial terjadinya kecelakaan. Selain itu pekerjaan konstruksi jugs memiliki risiko yang rawan terhadap munculnya berbagai gangguan kesehatan apalagi pada pekerjaan konstruksi yang pekerjaannya dilaksanakan pada lingkungan kerja yang umumnya terbuka. Oleh sebab itu, dalam setiap pekerjaan konstruksi diharapkan adanya upaya-upaya mengurangi risiko kecelakaan yang dapat terjadi. Target utama keselamatan dan kesehatan kerja adalah angka kecelakaan nihil pada setiap proyek, sehingga proyek dapat terselesaikan dalam waktu yang ditetapkan. Hal ini hanya dapat dilakukan secara menyeluruh, terpadu dan bertahap melalui suatu mekanisme sistem manajemen yang terintegrasi dengan baik. Keselamatan dan kesehatan kerja dalam bidang konstruksi merupakan bagian dari suatu upaya perencanaan dan pengendalian proyek untuk lebih mencapai kinerja biaya, mutu, waktu yang diinginkan secara berkaitan.
Penelitian ini bertujuan untuk mengetahui kualitas faktor Keselamatan dan Kesehatan Kerja (K3) dan pengaruhnya terhadap kinerja waktu penyelesaian pmyek konstruksi bangunan tinggi di Jabotabek.
Setelah mendapatkan variabel-variabel yang terdapat dalam faktor keselamatan dan kesehatan kerja selanjutnya dilakukan analisis dengan bantuan program SPSS dan Crystal Ball. Kemudian didapat hubungan yang signifikan, dimana kualitas faktor keselamatan dan kesehatan kerja dapat menaikan kinerja waktu penyelesaian proyek konstruksi bangunan tinggi di Jabotabek. Variabel-variabel penentu didapat yaitu keterlibatan top manajer terhadap masalah K3 dan pelatihan program K3 kepada pekerja proyek.

Construction industry is a complexity that involve the materials, equipment, method, cost, labor, that is potentially cause an accident. Also, it is have a risk cause healthy problems especially for the labor who work at open area. Therefore, it is important to have some effort in order to reduce the rate of accident that occurs in construction site. The primary target of Health and Safety is to achieve a zero number of accidents in every project so the contractor can finish their project in a proper time. It can do with overall, integrated to management system that is good integrated. Health and Safety in construction industry is a part of project planning and command in order to have cost, quality and time performance at the same time.
The aim of this research is to know the quality of Health and Safety factor and it is influence with time performance to finish the high-rise building project in Jabotabek.
After getting the variables in Health and Safety factor, then make an analyze with SPSS 13.00 and Crystal Ball. There is a connection which is very significant, that is a quality of Health and Safety Factor can cause time performance to finish high-rise building project in Jabotabek. Definite variables are top manager support in Health and Safety problems and Health and Safety training for all labor.

 File Digital: 1

Shelf
 T 16868a.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T16868
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : x, 86 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T16868 15-19-378456913 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 89445
Cover