UI - Tesis Membership :: Back

UI - Tesis Membership :: Back

Balance scorecard sebagai alat evaluasi kinerja pda proyek CPO Longkali Kaltim

Muhamad Pryambodho; Azhar Hadi, supervisor (Fakultas Teknik Universitas Indonesia, 2002)

 Abstract

It is important to be competitive to survive in the era of globalization. The competitive company is indicated by skilled and capable human resources to produce an efficient product together with customer satisfaction. Take an employee as a shareholder, will led them to work smart and seriously and the company gives an appropriate reward regarding to employee performance. Therefore it is also important to formulate a reward system. Thus the company and employee get fair profit.
Objective of this study is to know employees perfonnance relationship among engineering, procurement, and construction groups in the finalization of Longkali CPO Project in Fast Kalimantan. Balance Scorecard is used as evaluation tools. Thus we are getting reward value for each employee according to perspective of finance, customer, business process, and learning and growth in the project. The other objective is to study employee performance evaluated by ?Balance Scorecard" and reward relationship.
The highest value is variable l (50%). In Engineering, variable l is number of drawing with error indicator requisition less than 5%. In procurement, variable l is material procurement with error indicator requisition less than 5%. In construction, variable t is method of work with error implementation less than 5%. Variable l has influence to employee?s pcrfomrance in engineering, procurement, and construction groups to finish a project. Variable 1 is the main parameter that must be concerned. The lowest value is variable 5(30%), In Engineering, Procurement, and Construction, variable 5 is a speed of services. Time is an indicator to response customer is a parameter which has less attention to be follow up.
The comparative analysis (3 samples) used Kruskal-Wallis hypothesis. The conclusion that there is no significant differences in determining amount of perspectives among Engineering, Procurement, and Construction.The Associative analysis used Spearmann-Rank Correlation Hypothesis. The conclusion is that all of the perspective variable has significant relationship each other. The smallest and the biggest of Relationship factor are 0.458 and 0.9 in respectively. The speed of customer service is a factor that have to be concemed. Therefore it is necessary to have a bcttter coordination in and among Engineering, Procurement, and Construction groups.

 Digital Files: 1

Shelf
 T5919-Muhamad Pryambodho.pdf :: Download

LOGIN required

 Keyword

 Metadata

Collection Type : UI - Tesis Membership
Call Number : T5919
Main entry-Personal name :
Additional entry-Personal name :
Additional entry-Corporate name :
Study Program :
Subject :
Publishing : Depok: Fakultas Teknik Universitas Indonesia, 2002
Cataloguing Source
Content Type
Media Type
Carrier Type
Physical Description x, 75 hlm. : ill. ; 28 cm. + lamp.
Concise Text
Holding Institution Universitas Indonesia
Location Perpustakaan UI, Lantai 3
  • Availability
  • Review
  • Cover
Call Number Barcode Number Availability
T5919 15-19-075348676 TERSEDIA
Review:
No review available for this collection: 96789
Cover