UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Evaluasi pengelolaan limbah cair rumah sakit (studi kasus di rumah sakit islam jakarta)

Christopo Rusli; Wawolumaja, Corrie, supervisor (Program Pascasarjana Universitas Indonesia, 2003)

 Abstrak

Penyediaan teknologi pengolahan l imbah cair sebagai strategi pendekatan end of pipe treatment yang diterapkan pada suatu rumah sakit saat ini, kenyataannya masih menimbulkan masalah pencemaran dan Kerusakan lingkungan. Untuk mencegah pencemaran dan keru sakan lingkungan inilah maka penyediaan teknologi pengolahan limbah cair di rumah sakit harus direnca nakan, dioperasikan, dan dipelihara sekaligus dipadukan dengan pen rapan minimisasi limbah agar kualitas fluen limbah cair yang dihasilkan tetap memenuhi baku untuk limbah air rumah sakit sesuai dengan keputusan MenLH Nomor: 058/MenLH/12/1995.
Limbah yang dihasilkan oleh kegiatan rumah sakit d apat berbentuk padat, cair, maupu n gas, yang dapat digolongkan menjadi limbah domestik dan limbah klinik.
Beberapa akibat yang meru gikan yang diakibatkarn oleh adanya li mbah cai r adalah: I. Gangguan terhadap kesehatan, 2. Gangguan terhadap kehid upan aquatik, 3. Gangguan terhadap keindahan dan kenyaman, dan 4. Gangguan ferhadap air tanah dan air permukaan.
Dari berbagai penelitian tentang pengelolaan limbah rumah sakit; khususnya pengolahan limbah cair dan berdasarkan asil survey Badan Pengelolaan Lingkungan Hidup Daerah (BPLHD)-Propinsi DKI Jakarta terhadap kualitas limbah rsair rumah sakit yang dibuang ke Permasalahan diatas inilah yang mendorong peneliti untuk meneliti limbah cair di Rumah Sakit Islam Jakarta:
1. Apakah ada organisasi sistern pengelolaan limbah cair di Rumah Sakit Islam?
2. Apakah Instalasi Pengolahan Limbah Cair (IPAL) sudah berfungsi dengan baik?
3. Apakah Instalasi Pengolahan Air Limbah (IPAL) dan tangki septik dapat mengelola limbah cair secara menyeturuh?
4. Seberapa jauh persepsi masyarakat sekitar rumah sakit terhadap kemungkinan pencemaran sungai dan air tanah dangkal oleh lim bah cair Rumah Sakit Islam Jakarta.
Tujuan Penelitian
1. Dilakukannya evaluasi sistem pengolahan Iimbah cair dengan metode Siklus Pemecahan Masalah di Rumah Sakit Islam Jakarta.
2. Diketahuinya fungsi sistem pengolahan li mbah cair.
3. Diketahuinya kapasitas dari Instalasi Pengolahan Air Limbah (IPAL) dan tangki septik (septic tank).
4. Diketahuinya persepsi masyarakat sekita!r rumah sakit terhadap kemungkinan pencema ran sungai dan air tanah dangkal oleh lim bah cair Rumah Sakit Islam Jakarta.
Metode penelitian yang igunakan adalah metode evaluasi sistem analisis Siklus Pemecahan Masalab ( Problem Solving Cycle) metode ini memP.unyai 7 (tujuh) komponen yang dievaluasi dan sating mempengaruhi yaitu masukan (input), proses (process), keluaran (output), outcome, dampak [impact), umpan balik (feedback) dan lingkunga n (environment) yang berada dil ar sistem, Setiap komponen menggunakan beberapa parameter yang akan di analisis. Setiap parameter terdapat ua tolok ukur yaitu tolok ukur standar (Standard .Jlgures) dan tolok uku r basil pengamatan (Observe figures) dengan pendekatan sistem ( system approach) yaitu denga, n menyqsun urutan prioritas masalah dan menetapkan prioritasjalan keluar. (Sihombi ng, 2001. AzWar, r 98).
Hasil dan Pembahasan menunjukan bahwa, komitmen manajemen puncak tidak berjalan sehingga tidak a a pe hatian masyarakat rumah sakit terhadap pengelolaan li mbah. Sehingga teknologi pengolahan limbah rumah s kit tidak sesuai dengan persyaratan yang tetah dikelu arkan oleh pemerinta yang mengnaruskan p,engelolaan limbah bagi rumah sakit limbah cair Rumah Sakit Islam Jakarta se bagian besar atau hampir 70%.

Provision of technology of wastewater as end of pipe treat ent strategy appli eCJ at hospital has brought about environmental damage and pollution recently. To prevent environmental damage and pollution, technology of wastewater treatment should be well as be incorporated into application of waste minimization in erder that the quality standard of hospital wastewater required by the environmen tal ministerial decree numoer: 058/MenLH/1211995.
The waste produced by the hospital may be ·n the form of solid material, liquid, and gas which can be classified in to domestic and Glinic aste. Some perilous result due to the waste is: I . Deteriorates heal th, 2. Deteriorates llie aquatic life, 3. Deteriorates beauty and convinienc , and 4. deteriorates ground water and smface water.
From the research regarding the hospital waste management in big city, especially wastewater processing, and as res It of Enviromental Impact Management Agency (BPLHD)-DKI Jakarta to the qu ality of hospital' wastewater tha t th rown into the
1. Is there any organization management system of wastewater in Jakarta Islamic Hospital
2. Is the Wastewater Treatment Installation have functioned properly?
3. Is the Wastewater Treatment Installation and septik tank can organize wastewater by totally?
4. How far the perception of the society surrounding Jakarta Islamic Hospital about the wastewater pollution from hospital activities.
The objecti ve of this research is:
1. Done the evaluation of Wastewater Treatment Installation with Problem Solving Cycle in Jaka rta Islamic Hospital.
2. Known the function of Wastewater Treatment Installation.
3. Known the capacity of Wastewater Treatment Installation and septic tank.
4. Known of the perseption of the society su rrouding the Jakarta Islamic Hospital about the wastewater pollutiCi>n from hospital acti ities.
The Analysis System Problem Solving Cycle was used to evaluate the proper wa . of WC ..Stewater management and Wasterwater Installation. This method have 7 ev luated components and is influencing each other that is i nput, process, output, outcome, im pact, feed back and environment residing in outside system. Eaeh component use some parameter to anal is. Each garameter there are two measu ring s ndard of figures and observe figures with use of approach system that is by C@mpilin_g priority sequence o£ problem of and specify way out priori.
The result of research shown that; the commitment of u pper management is not implemented, i t makes the society of this hospital does not care to the wastewater management So, the hospital wastewater technology management is not comply witH required standard quality from govemment in order that liospital should managed His wasterwater before aischarged to the elilvironment Most or almost 70% Jakarta Islamic Hospital's wastewater are using septic tank technlog:y ana 30% using Wastewater Treatment with cascade aeration technology.

 File Digital: 1

Shelf
 T11898-Christopo Rusli.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T11898
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Program Pascasarjana Universitas Indonesia, 2003
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : x, 112 hlm. : ill. ; 29 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T11898 15-19-163564556 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 98212
Cover