UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan Pedoman Pengendalian Proyek Pembangunan Gedung Kantor di Lingkungan BPJS Ketenagakerjaan Berbasis Risiko untuk Meningkatkan Kinerja Waktu = Development of a Risk-Based Controlling Guidelines for Office Building Construction Project within BPJS Ketengakerjaan to Improve Time Performance

Dhaniah Fijriyani; Wisnu Isvara, supervisor; Rossy Armyn Machfudiyanto, supervisor; Ayu Herzanita Yufrizal, examiner; Rosmariani Arifuddin, examiner (Fakultas Teknik Universitas Indonesia, 2022)

 Abstrak

Beberapa pembangunan gedung kantor di lingkungan BPJS Ketenagakerjaan selama 5 (lima) tahun terakhir mengalami keterlambatan dalam penyelesaian proyek. Hal tersebut disebabkan proses pengendalian pembangunan gedung kantor belum belum berjalan dengan baik dengan memperhatikan risiko yang dapat mempengaruhi kinerja waktu. Penelitian ini menggunakan kuesioner sebagai instrument penelitian yang disebarkan kepada responden dan dilakukan validasi oleh pakar. Analisa risiko kualitatif dilakukan pada penelitian untuk mengetahui faktor risiko yang ada selama siklus hidup pembangunan gedung dan mengembangkannya dengan manajemen risiko berbasis PMBOK edisi keenam. Hasil dari penelitian ini berupa faktor risiko tinggi dan respon risiko untuk pengembangan pedoman pengendalian proyek pembangunan gedung kantor yang ada di lingkungan BPJS Ketenagakerjaan sehingga dapat meningkatkan kinerja waktu proyek.

Several office building constructions within BPJS Ketenagakerjaan during the last 5 (five) years have experienced delays in project completion. This is because the control process for the construction of office buildings has not gone well by taking into account the risks that can affect time performance. This study used a questionnaire as a research instrument distributed to respondents and validated by experts. Qualitative risk analysis was carried out in research to determine the risk factors that exist during the building construction life cycle and develop them with risk management based on PMBOK sixth edition. The results of this study are in the form of high-risk factors and risk responses for developing guidelines for controlling office building construction projects within the Employment BPJS to improve project time performance.

 File Digital: 1

Shelf
 T-Dhaniah Fijriyani.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2022
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xxi, 215 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-03938572 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920516948
Cover