Strategi Pemilihan Subkontraktor untuk Meminimalkan Permasalahan Kinerja Subkontraktor dengan Metode AHP (Analytical Hierarchy Process) (Studi Kasus pada PT. Hutama Karya Infrastruktur) = Subcontractor Selection Strategy to Minimize Subcontractor Performance Problems using AHP (Analytical Hierarchy Process) Method (Case Study at PT. Hutama Karya Infrastruktur)

Rohmat Danang Nur Riyadi; Arviansyah, supervisor; Ratih Dyah Kusumastuti, examiner (Fakultas Ekonomi dan BIsnis Universitas Indonesia, 2023)

 Abstrak

PT. Hutama Karya Infrastruktur sebagai kontraktor utama yang memiliki tugas untuk menyelesaikan kontrak pekerjaannya yang kompleks akan membagi pekerjaannya kepada subkontraktor-subkontraktor untuk item dominan. Proses pemilihan subkontraktor akan berpengaruh terhadap kinerja pelaksanaan di lapangan, sehingga diperlukan evaluasi kriteria-kriteria yang berpengaruh dalam proses pemilihan subkontraktor dan strategi yang digunakan untuk memperbaiki proses pemilihan sehingga memperoleh subkontraktor yang berkinerja terbaik. Selanjutnya kriteria-kriteria tersebut akan dianalisis dengan metode Analytical Hierarchy Process (AHP) sehingga diperoleh keputusan terbaik dalam menentukan prioritas kriteria-kriteria dalam proses pemilihan subkontraktor. Hasil penelitian menunjukkan bahwa kriteria utama yang berpengaruh terhadap kinerja subkontraktor dimulai dari yang terbesar adalah kinerja dan MK3LL (Mutu, Keselamatan dan Kesehatan Kerja, Lindung Lingkungan), dan diikuti dengan sumber daya, harga, strategi kemitraan, dan administrasi.

PT. Hutama Karya Infrastruktur as the main contractor who has the task of completing complex work contracts outsources the work to subcontractors for dominant items. Subcontractor selection process will have a major effect on the performance results of a construction project. It is necessary to evaluate the criteria that influence the process of subcontractor’s selection process and to determine the strategies used to improve the selection process to obtain subcontractors with the best performance. Those criteria were analyzed using the Analytic Hierarchy Process (AHP) method to obtain the best decision in determining the priority of the criteria in the subcontractor selection process. The results showed that the top priorities criteria are performance and QHSSE (Quality, Health, Safety, Security, and Environment) followed by resources, prices, partnership strategy, and administration accordingly.

 File Digital: 1

Shelf
 T-Rohmat Danang Nur Riyadi.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan BIsnis Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 68 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-47699469 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920523366
Cover