UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan Standard Method Of Measurement untuk Pekerjaan Galian dan Timbunan Tanah pada Proyek Jalan Tol Berbasis Building Information Modelling untuk Meningkatkan Akurasi Perhitungan Kuantitas = Development of a Standard Method of Measurement for Cut And Fill Works on Building Information Modelling-Based Toll Road Projects to Improve Quantity Calculation Accuracy

Astuti Fahmilia; Wisnu Isvara, supervisor; Fadhilah Muslim, examiner; Rossy Armyn Machfudiyanto, examiner; Ayu Herzanita Yufrizal, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Dalam dunia konstruksi konflik, klaim dan perselisihan (dispute) merupakan hal yang tidak bisa dihindari keberadaanya namun tidak dapat dibiarkan terjadi terus menerus karena akan merugikan para pihak, sehingga dibutuhkan tindakan pencegahan maupun penyelesaiannya. Di Industri konstruksi dispute banyak yang berhubungan dengan bill of quantity (BOQ) yang tidak akurat. Untuk mencegah terjadinya hal tersebut maka dibutuhkan adanya standard method of measurement (SMM) yang akan memberikan keseragaman perhitungan. Selain itu SMM harus menyesuaikan dengan kemajuan industri seperti penggunaan building information modelling (BIM) yang juga bisa digunakan dalam proses perhitungan kuantitas. Metode penelitian yang digunakan adalah deskriptif kualitatif yang melibatkan pakar terkait. Hasil dari penelitian ini adalah pengembangan standard method of measurement pada pekerjaan galian dan timbunan tanah pada proyek jalan tol berbasis BIM untuk meningkatkan akurasi perhitungan kuantitas.

In the construction industry conflicts, claims, and disputes are unavoidable however cannot be allowed to occur continuously because will be a disadvantage for the parties. Therefore, preventive and resolution actions are needed. in the construction industry, many disputes are related to inaccurate Bill of Quantity (BOQ). To prevent this, it is necessary to have a standard method of measurement (SMM) that will provide uniformity in calculations. In addition, SMM must adapt to the industry’s development such as the use of Building Information Modelling (BIM) which can help as a Quantity Take-Off (QTO) tool. The research method used is descriptive qualitative involving related experts. The result is the development of a standard method of measurement for cut and fill works for BIM-based toll road projects to improve quantity calculation accuracy.

 File Digital: 1

Shelf
 T-Astuti Fahmilia.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvi, 121 pages ; illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-47770265 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920525187
Cover