UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Kajian Teknis Pemilihan Alat Berat dan Perhitungan Estimasi Biaya Produksi untuk Kegiatan Pembuangan Overburden di PT HPU Site BDA, Muara Teweh = Technical Studies of Heavy Equipment Selection And Production Cost Estimation Calculation for Overburden Removal Activities on PT HPU Site BDA, Muaara Teweh

Kristanto Nugroho; Josia Irwan Rastandi, supervisor (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

PT Harmoni Panca Utama (PT HPU) adalah perusahaan yang bergerak di bidang kontraktor pertambangan. Salah satu project PT HPU yang saat ini berjalan adalah kontraktor pertambangan untuk pekerjaan pembuangan overburden di area konsesi tambang batubara PT Batubara Dua Ribu Abadi (PT BDA), Muara Teweh, Kalimantan Tengah. Untuk pekerjaan tersebut, PT HPU saat ini menggunakan alat berat excavator kelas 40-50 ton serta truk kelas 30 ton. Untuk meningkatkan produksinya dari 5.000.000 BCM/tahun menjadi 10.000.000 BCM/tahun, PT HPU berencana untuk menggunakan alat berat dengan kapasitas yang lebih besar yaitu excavator kelas 120 ton serta truk kelas 91 ton.Di penelitian ini penulis melakukan uji seismik refraksi untuk pemilihan bulldozer berdasarkan kemampuan ripabiltasnya. Selain itu juga dilakukan uji daya dukung tanah dengan metode Dynamic cone penetrometer untuk pemilihan dump truck . Penulis juga melakukan perhitungan estimasi jumlah kebutuhan alat berat, produktifitas serta biaya produksi untuk kegiatan pembuangan overburden.Dari hasil studi lapangan diperoleh kesimpulan bahwa untuk material pasir tidak direkomendasikan menggunakan HD785-7 dan cukup untuk direct digging. Untuk material clay dapat beroperasi HD785-7 dan memerlukan D155A-2 untuk ripping material.

PT Harmoni Panca Utama (PT HPU) is mining contracting company. One of PT HPU current project is overburden removal contractor at PT Batubara Dua Ribu Abadi (PT BDA) concession. For that project, PT HPU currently using 40-50 ton class excavator and 30 ton class dump truck. For enhance their production target from 5.000.000 BCM/year to 10.000.000 BCM/year next year, PT HPU plan for using bigger excavator on 120 ton class, 91 ton class dump truck and D155A-2 bulldozer for ripping material. On this research, writer doing seismic refraction test for bulldozer selection based on its rippability. Beside that, CBR testing with Dynamic Cone Penetrometer was also carried out to determine dump truck selection. This study also calculate estimation number of heavy equipment needs, productivity and production cost for overburden removal activity. The conclusion of this study is sand material not recommend for HD785-7 operation and able for direct digging. For clay material is recommend for HD785-7 and need D155A-2 for ripping material.

 File Digital: 1

Shelf
 PR-Kristanto Nugroho.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiv, 51 pages : illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-pdf 16-24-13951648 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920525434
Cover