Pemilihan Metode Konstruksi Pemasangan Rangka Atap Stasiun Halim pada Proyek Kereta Cepat Jakarta-Bandung (KCJB) = Selection of Roof Truss Installation Construction Method in High-Speed Rail Jakarta Bandung Project

Situmorang, Sandhy Putra Sanjaya; Sutrasno Kartohardjono, supervisor; Yuskar Lase, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Abstrak Berbahasa Indonesia/Berbahasa Lain (Selain Bahasa Inggris):
Metode pelaksanaan konstruksi merupakan kunci untuk mewujudkan seluruh perencanaan menjadi bentuk bangunan fisik. Kebutuhan untuk menghadirkan wujud fisik bangunan dengan seefisien mungkin adalah tuntutan yang harus dapat dijawab oleh para pelaku dunia konstruksi. Proyek pembangunan rangka atap stasiun Halim Kereta Cepat Jakarta Bandung (KCJB), memiliki bentuk geometri rangka atap yang bergelombang dengan tingkat kepresisian pemasangan yang tinggi dan dengan schedule yang singkat. Dengan kompleksitas pekerjaan seperti itu, maka perlu dilakukan suatu pemilihan metode kerja yang efektif dan efisien. Pada penulisan laporan ini, akan dibahas suatu pemilihan metode pemasangan rangka atap yaitu metode pemasangan dengan crawler crane dan metode konvensional dengan temporary support. Usulan metode tersebut merupakan hasil studi banding dan penelitian di lapangan yang dilakukan untuk penulisan laporan ini. Hasil tersebut berdasarkan variabel waktu pelaksanaan dan biaya pemasangan. Hasil penelitian menunjukkan penggunaan pilihan metode pemasangan rangka atap dengan menggunakan crawler crane lebih efektif dan efisien dalam segi waktu pelaksanaan dan biaya pemasangan.

The construction implementation method is the key to realizing the entire plan into a physical building form. The need to present the physical form of a building as efficiently as possible is a demand that must be answered by actors in the construction world. The roof truss construction project for the Halim Station High Speed Rail Jakarta Bandung Project (KCJB), has a corrugated roof truss geometric shape with a high level of installation precision and with a short schedule. With such a complexity of work, it is necessary to select an effective and efficient work method. In writing this report, a selection of roof truss installation methods will be discussed, namely the installation method with crawler cranes and the conventional method with temporary support. The proposed method is the result of a comparative study and field research conducted for the writing of this report. These results are based on the variables of implementation time and installation costs. The results showed that the use of the choice of roof truss installation method using a crawler crane was more effective and efficient in terms of implementation time and installation costs.

 File Digital: 1

Shelf
 PR-Sandhy Putra Sanjaya Situmorang.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-PDF
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 73 pages ; illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
PR-PDF 16-24-14511241 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920525961
Cover