Analisis Penjadwalan Produksi dan Keseimbangan Lini Untuk Produksi Lensa Polycarbonate = Analysis of Production Scheduling and Line Balancing for Polycarbonate Lens Production

Cansa Julisa Muhammad Yusuf; Andri Dwi Setiawan, supervisor; Zulkarnain, examiner; Armand Omar Moeis, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Perencanaan dan penjadwalan produksi umumnya diperlakukan secara berurutan. Berdasarkan tinjauan kritis penerapan teknik simulasi untuk masalah Perencanaan dan Pengendalian Produksi (PPC) antara tahun 2022 dan 2014, literatur secara sistematis dipersempit dari sekitar 2.250 menjadi 131. Lima masalah yang dipertimbangkan dalam PPC adalah perencanaan sumber daya fasilitas, perencanaan kapasitas, perencanaan pekerjaan, perencanaan proses dan penjadwalan produksi. Pengembangan sistem pakar dalam penjadwalan menimbulkan banyak masalah dan berbagai pendekatan telah dicoba dalam sistem prototipe. Salah satu perusahaan manufaktur yang memproduksi lensa polycarbonate menerapkan sistem make to order. Berdasarkan penjadwalan produksi yang telah diterapkan, target penyelesaian pesanan selama 30 hari belum terpenuhi. Berdasarkan permasalahan pada penjadwalan produksi, dilakukan analisis penjadwalan produksi dan keseimbangan lini untu produksi lensa polycarbonate. Sehingga, dapat memenuhi target penyelesaian pesanan yang telah ditetapkan.

Production planning and scheduling are generally treated sequentially. Based on a critical review of the application of simulation techniques to Production Planning and Control (PPC) problems between 2002 and 2014, the literature was systematically narrowed from about 2,250 to 131. The five problems considered in PPC are facility resource planning, capacity planning, work planning , process planning and production scheduling. The development of expert systems in scheduling poses many problems and many different approaches have been tried in prototyping systems. One of the manufacturing companies that produce polycarbonate lenses applies a make to order system. Based on the production scheduling that has been applied, the order completion target has not been met for 30 days. Based on the problem in production scheduling, analyzing by production scheduling and line balancing for polycarbonate lens production. So it can meet the target completion of orders that have been set.

 File Digital: 1

Shelf
 T-Cansa Julisa Muhammad Yusuf.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 20 pages : illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-23-58855302 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920526358
Cover