Analisis Risiko dalam Proses Pengadaan Barang dan Jasa untuk Overhaul Pembangkit Listrik Tenaga Uap = Risk Analysis in the Procurement Process of Goods and Services for Steam Power Plant Overhaul

Rangga Damar Bagaskara; Novandra Rhezza Pratama, supervisor; Djoko Sihono Gabriel, examiner; Farizal, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Kegiatan overhaul pembangkit listrik bertujuan untuk menjaga keandalan pembangkit listrik sehingga dapat beroperasi secara maksimal dan dapat meminimalkan jumlah terjadinya force outage. Seluruh pihak yang terlibat dalam kegiatan overhaul ini harus mampu bekerja secara dinamis sesuai kondisi yang ada untuk mendukung tercapainya kinerja overhaul yang on time, on cost, on quality, on scope, on clean, dan on safety (6 ON). Oleh karena itu, dibutuhkan sebuah analisis dan mitigasi risiko dalam proses pengadaan barang dan jasa untuk overhaul pembangkit listrik sehingga dapat membantu perusahaan dalam mengambil keputusan. Metode Analytic Network Process (ANP) untuk mendapatkan bobot penyebab risiko (risk agent) yang berpengaruh terhadap terjadinya suatu risiko (risk event). Metode House of Risk (HOR) untuk melakukan identifikasi, analisis dan mitigasi risiko. Hasil penelitian menunjukkan terdapat 12 tipe risiko dengan 18 risiko yang disebabkan oleh 20 penyebab risiko. Berdasarkan perhitungan nilai Aggregate Risk Potential (ARP), didapatkan 2 tindakan mitigasi risiko yang dapat dilakukan. Penerapan 2 tindakan mitigasi risiko ini diharapkan dapat meminimalisasi peluang terjadinya dan dampak dari penyebab risiko.

Power plant overhaul activities aim to maintain the reliability of the power plant so that it can operate optimally and can minimize the number of force outages. All parties involved in this overhaul activity must be able to work dynamically according to existing conditions to support the achievement of overhaul performance that is on time, on cost, on quality, on scope, on clean, and on safety (6 ON). Therefore, a risk analysis and mitigation is needed in the process of procuring goods and services for power plant overhaul so that it can help companies make decisions. The Analytic Network Process (ANP) method to obtain the weight of risk agents that affect the occurrence of a risk (risk event). House of Risk (HOR) method for risk identification, analysis and mitigation. The results showed there were 12 types of risk with 18 risks caused by 20 risk causes. Based on the calculation of the Aggregate Risk Potential (ARP) value, 2 risk mitigation actions can be taken. The implementation of these 2 risk mitigation actions is expected to minimize the chance of occurrence and impact of the risk causes.

 File Digital: 1

Shelf
 T-Rangga Damar Bagaskara.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xv, 110 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-24-55316628 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920537759
Cover