UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Strategi Pengembangan Perencanaan Alokasi Tenaga Kerja pada Proyek Konstruksi di Indonesia = Strategy Development For Allocation Human Resource Planning in Construction Projects in Indonesia

Rizki Dewayani Putri; Rossy Armyn Machfudiyanto, supervisor; Ayomi Dita Rarasati, examiner; Leni Sagita Riantini, examiner; Rully Andhika, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Proyek konstruksi di Indonesia mengalami peningkatan setiap tahunnya. Ketersediaan sumber daya manusia di dalam proyek konstruksi sangat penting. Tenaga kerja proyek membantu dalam penyelesaian proyek konstruksi. Perencanaan alokasi tenaga kerja merupakan faktor yang penting di dalam proyek konstruksi. Jika perencanaan kurang maksimal, maka akan mengakibatkan proyek tersebut terlambat dan akan menyebabkan cost overrun. Penelitian ini menggunakan validasi pakar dan uji statistik responden untuk mengetahui faktor apa saja mempengaruhi pemilihan tenaga kerja dan pengaruh antar variabel penelitian terhadap kinerja waktu dan biaya proyek. Didapatkan hasil faktor pemilihan tenaga kerja, antara lain faktor biaya, ketenagakerjaan, dan perusahaan. Terdapat pengaruh ke arah negatif pada faktor biaya terhadap kinerja biaya dan waktu proyek. Faktor ketenagakerjaan ke arah positif terhadap kinerja biaya dan waktu proyek. Dan faktor perusahaan ke arah positif terhadap kinerja biaya dan waktu proyek. Kemudian disusun strategi pengembangan perencanaan alokasi tenaga kerja untuk meningkatkan kinerja biaya dan waktu proyek. Penelitian kedepannya diharapkan dapat mengembangkan perencanaan alokasi tenaga kerja karena masih banyak faktor yang dapat meningkatkan kinerja biaya dan waktu proyek.

The construction projects in Indonesia have been experiencing consistent growth annually. The availability of human resources within these projects is crucial for their successful completion. Human resource in projects plays a vital role in contributing to the accomplishment of construction projects. Effective planning of human resource allocation emerges as a critical factor in construction projects. Suboptimal planning may result in project delays and cost overruns. This research employs expert validation and statistical testing of respondent data to identify factors influencing workforce selection and the interplay of these variables on project time and cost performance. The study reveals that human resource selection factors include cost, human resource, and company-related elements. The analysis indicates a negative influence of cost factors on project cost and time performance, a positive influence of human resource factors on project cost and time performance, and a positive influence of company-related factors on project cost and time performance. Consequently, a strategic development plan for human resource allocation planning is proposed to enhance project cost and time performance. Future research is anticipated to further develop human resource allocation planning, considering additional factors that could contribute to improving project cost and time performance.

 File Digital: 1

Shelf
 T-Rizki Dewayani Putri.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvi, 141 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-24-66587090 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920538222
Cover