UI - Tesis Membership :: Back

UI - Tesis Membership :: Back

Strategi Pengembangan Perencanaan Alokasi Tenaga Kerja pada Proyek Konstruksi di Indonesia = Strategy Development For Allocation Human Resource Planning in Construction Projects in Indonesia

Rizki Dewayani Putri; Rossy Armyn Machfudiyanto, supervisor; Ayomi Dita Rarasati, examiner; Leni Sagita Riantini, examiner; Rully Andhika, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstract

Proyek konstruksi di Indonesia mengalami peningkatan setiap tahunnya. Ketersediaan sumber daya manusia di dalam proyek konstruksi sangat penting. Tenaga kerja proyek membantu dalam penyelesaian proyek konstruksi. Perencanaan alokasi tenaga kerja merupakan faktor yang penting di dalam proyek konstruksi. Jika perencanaan kurang maksimal, maka akan mengakibatkan proyek tersebut terlambat dan akan menyebabkan cost overrun. Penelitian ini menggunakan validasi pakar dan uji statistik responden untuk mengetahui faktor apa saja mempengaruhi pemilihan tenaga kerja dan pengaruh antar variabel penelitian terhadap kinerja waktu dan biaya proyek. Didapatkan hasil faktor pemilihan tenaga kerja, antara lain faktor biaya, ketenagakerjaan, dan perusahaan. Terdapat pengaruh ke arah negatif pada faktor biaya terhadap kinerja biaya dan waktu proyek. Faktor ketenagakerjaan ke arah positif terhadap kinerja biaya dan waktu proyek. Dan faktor perusahaan ke arah positif terhadap kinerja biaya dan waktu proyek. Kemudian disusun strategi pengembangan perencanaan alokasi tenaga kerja untuk meningkatkan kinerja biaya dan waktu proyek. Penelitian kedepannya diharapkan dapat mengembangkan perencanaan alokasi tenaga kerja karena masih banyak faktor yang dapat meningkatkan kinerja biaya dan waktu proyek.

The construction projects in Indonesia have been experiencing consistent growth annually. The availability of human resources within these projects is crucial for their successful completion. Human resource in projects plays a vital role in contributing to the accomplishment of construction projects. Effective planning of human resource allocation emerges as a critical factor in construction projects. Suboptimal planning may result in project delays and cost overruns. This research employs expert validation and statistical testing of respondent data to identify factors influencing workforce selection and the interplay of these variables on project time and cost performance. The study reveals that human resource selection factors include cost, human resource, and company-related elements. The analysis indicates a negative influence of cost factors on project cost and time performance, a positive influence of human resource factors on project cost and time performance, and a positive influence of company-related factors on project cost and time performance. Consequently, a strategic development plan for human resource allocation planning is proposed to enhance project cost and time performance. Future research is anticipated to further develop human resource allocation planning, considering additional factors that could contribute to improving project cost and time performance.

 Digital Files: 1

Shelf
 T-Rizki Dewayani Putri.pdf :: Download

LOGIN required

 Metadata

Collection Type : UI - Tesis Membership
Call Number : T-pdf
Main entry-Personal name :
Additional entry-Personal name :
Additional entry-Corporate name :
Study Program :
Subject :
Publishing : Depok: Fakultas Teknik Universitas Indonesia, 2023
Cataloguing Source LibUI ind rda
Content Type text
Media Type computer
Carrier Type online resource
Physical Description xvi, 141 pages : illustration + appendix
Concise Text
Holding Institution Universitas Indonesia
Location Perpustakaan UI
  • Availability
  • Review
  • Cover
Call Number Barcode Number Availability
T-pdf 15-24-66587090 TERSEDIA
Review:
No review available for this collection: 9999920538222
Cover