UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Studi Kelayakan Dan Desain Awal Pembangunan Jalan Ruas Tambu –Kasimbar Provinsi Sulawesi Tengah = Feasibility Study and Preliminary Design of Tambu – Kasimbar Road Construction of Central Sulawesi Province

Lisa Arnita Anzar; Yusuf Latief, supervisor; Widjojo Adi Prakoso, examiner (Fakultas Teknik Universitas Indonesia, 2023)

 Abstrak

Studi kelayakan pembangunan jalan Tambu-Kasimbar dimaksudkan untuk mendapat nilai manfaat secara ekonomi dari rencanan Pembangunan jalan Tambu-Kasimbar dalam mendukung konektifitas IKN dan Indonesia Timur. Pendekatan dengan proyek (with project) diasumsikan sebagai suatu kondisi, dimana diperlukan suatu investasi/proyek yang besar, yang dilaksanakan untuk meningkatkan kapasitas maupun struktur jalan. Sedangkan untuk pendekatan tanpa proyek (without project) diasumsikan sebagai suatu kondisi, dimana tidak ada investasi/proyek yang dilaksanakan untuk meningkatkan kapasitas maupun struktur jalan, kecuali untuk mempertahankan fungsi pelayanan jalan, yaitu berupa pemeliharaan rutin dan pemeliharaan berkala. Tahapan analisis dimulai dengan formulasi dari 3 (tiga) alternatif ruas terpilih yang selanjutnya dibuat desain pendahuluan pada perencanaan trase jalan dan nilai tebal perkerasan. Komponen biaya manfaat dihitung berdasarkan pendekatan coustemer suprplus yang didasarkan saving Biaya Operasional Kendaraan (BOK), dan saving nilai waktu. proses analisis kelayakan ekonomi ini dilakukan untuk menghitung kelayakan pembangunan dan pengoperasian Ruas Jalan Tambu – Kasimbar CS dengan membandingkan antara jumlah biaya (cost) terhadap manfaat (benefit pada pengguna lalu lintas/consumer surplus berupa penghematan Biaya Operasi Kendaraan dan Nilai Waktu. Hasil studi diperoleh Total biaya manfaat dari customer surplus adalah Rp. 712,458 Milyar pertahun. Nilai EIRR sebesar 16.89% memenuhi kelayakan ekonomi >12%, BCR suku Bungan 12% sebesar 2.38% >1, Nilai Net Present Value (NPV) = Rp. 5.254.783.058,- >0 sehingga dapat disimpulkan pembangunnan jalan Ruas Tambu-Kasimbar layak dilaksanakan dari segi lalulintas maupun ekonomi Implementasi praktik keinsinyurandalam rencana pembangunan jalan ruas tambu – kasimbar anata lain; analisis teknis yang komprehensif, pertimbangan aspek lingkungan dan sosial, konsultasi dengan pemangku kepentingan, analisis risiko dan keselamatan kerja, pemilihan material dan teknologi yang tet diterapkan dalam pelaksanaan studi ini.

The feasibility study of Tambu-Kasimbar road construction is intended to benefit economically from the Tambu-Kasimbar road development plan in supporting IKN and Eastern Indonesia connectivity. The approach with the project is assumed to be a condition, where a large investment/project is required, which is carried out to improve the capacity and structure of the road. As for the no-project approach, it is assumed as a condition, where no investment/project is carried out to increase the capacity or structure of roads, except to maintain the function of road services, namely in the form of routine maintenance and periodic maintenance. The analysis stage begins with the formulation of 3 (three) alternative selected sections which are then made preliminary designs on road trase planning and pavement thickness values. The cost benefit component is calculated based on the coustemer suprplus approach which is based on saving Vehicle Operating Costs (BOK), and saving time value. This economic feasibility analysis process is carried out to calculate the feasibility of building and operating the Tambu – Kasimbar CS Road Section by comparing the total costs (costs) to benefits (benefits to traffic users / consumer surplus in the form of savings in Vehicle Operating Costs and Time Value. The results of the study obtained The total cost of benefits from customer surplus is Rp. 712,458 billion per year. EIRR value of 16.89% meets economic feasibility of >12%, BCR of Bungan tribe 12% of 2.38% >1, Net Present Value (NPV) = Rp. 5,254,783,058,- >0 so that it can be concluded that the construction of the Tambu-Kasimbar section is feasible in terms of traffic and economy Implementation of engineering practices in the tambu – kasimbar anata road construction plan of other anata sections; Comprehensive technical analysis, consideration of environmental and social aspects, consultation with stakeholders, occupational risk and safety analysis, selection of materials and technologies that have been applied in the implementation of this study.

 File Digital: 1

Shelf
 PR-Lisa Arnita Anzar.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : PR-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2023
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvii, 71 pages : illustration
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
No. Panggil No. Barkod Ketersediaan
PR-pdf 16-24-07661692 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920538242
Cover