UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Model Pengaruh Komponen Manajemen Konstruksi Terhadap Capaian Mutu Preservasi Jalan dengan Kontrak Long Segment pada Ruas Jalan Nasional di Provinsi Kalimantan Barat = Management Components on the Achievement of Road Preservation Quality with Long Segment Schemes on National Roads in West Kalimantan

Marhara Tua; Ayomi Dita Rarasati, supervisor; Henki Wibowo Ashadi, examiner; Rahayu Setiawati, examiner; Rosmariani Ariffudin, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Kalimantan Barat merupakan provinsi terluas keempat setelah Papua, Kalimantan Timur dan Kalimantan Tengah dengan luas wilayah daratan seluas 146.807 km². Panjang jalan nasional dalam provinsi ini sepanjang 2117,17 km dengan kondisi kemantapan jalan 93.88%. Karakteristik mutu konstruksi dan kontribusi komponen manajemen konstruksi terhadap capaian mutu perlu diketahui, agar pekerjaan dapat dilaksanakan secara efektif dan efisien. Penelitian ini bertujuan untuk mendapatkan karakteristik mutu yang diinginkan dalam preservasi jalan dengan kontrak long segment, serta kontribusi komponen manajemen konstruksi terhadap capaian mutu dimaksud. Kuesioner disebar kepada para stakeholder penyelenggaraan Jalan Nasional di Provinsi Kalimantan Barat. Hasil penelitian menunjukkan bahwa kedua kelompok responden yaitu owner dan penyedia jasa sepakat bahwa (1) ketepatan desain, (2) pemahaman terhadap metode, jadwal, dan desain, dan (3) ketepatan mutu adalah komponen manajemen konstruksi dengan peringkat teratas. Analisa regresi linier berganda merumuskan bahwa X5 – Desain dan Supervisi adalah variabel dengan pengaruh terbesar terhadap capaian mutu preservasi jalan kontrak long segment.

West Kalimantan is the fourth largest province after Papua, East Kalimantan, and Central Kalimantan with a land area of 146.807 km². The length of the national roads in this province is 2.117,17 km with road stability rating of 93,88%. The characteristics of construction quality and the contribution of the construction management component to quality achievement need to be identified and analyzed, so that road preservation work can be carried out effectively and efficiently. This study aims to obtain the desired quality characteristics in road preservation with a long segment contract, as well as the contribution of construction management components to the intended quality achievement. The questionnaire was distributed to stakeholders of National Road network preservation in West Kalimantan Province. Results show that both owners and service providers agree that (1) design accuracy, (2) understanding of method, schedule and design, and (3) quality accuracy are the highest rank components of construction management. Multiple linear regression formulates that X5 – Design and Supervision is the variable with the most impact on quality of road preservation with long segment contract.

 File Digital: 1

Shelf
 T-Marhara Tua.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 73 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-25-55091626 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920560946
Cover