Pengembangan Proses Bisnis Dalam Proses Pengadaan Rumah Susun Bertingkat Tinggi Berbasis Risiko Untuk Meningkatkan Kinerja Waktu Pelaksanaan di Kementerian Pekerjaan Umum dan Perumahan Rakyat = Development of Business Process Base on Risk in Procurement Process of High Rise Vertical Housing To Improve Performance Time in The Ministry of Public Works and Housing

Marendi Rahman; Mohammed Ali Berawi, supervisor; Ayomi Dita Rarasati, examiner; Leni Sagita Riantini, examiner; Rossy Armyn Machfudiyanto, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Direktorat Jenderal Perumahan Kementerian Pekerjaan Umum dan Perumahan Rakyat yang membawahi Direktorat Rumah Susun memiliki peran dalam rangka pelaksanaan pembangunan perumahan sebagai tempat tinggal yang layak untuk masyarakat dimana salah satu programnya dengan Pembangunan Rumah Susun. Pelaksanaan pembangunan rumah susun memiliki catatan bahwa masih banyaknya pembangunan rumah susun tersebut yang mengalami keterlambatan dalam penyelesaiaan pekerjaan. Salah satu faktor penyebabnya adalah dari proses pengadaan yang belum sempura. Oleh sebab itu, evaluasi dan pengembangan proses bisnis pada proses pengadaan pekerjaan tersebut perlu dilakukan. Penelitian ini bertujuan untuk mengembangkan proses bisnis pada proses pengadaan rumah susun berbasis resiko di Kementerian Pekerjaan Umum dan Perumahan Rakyat, menggunakan metode analisis risiko kualitatif dengan menggunakan data primer dan sekunder berupa arsip yang ada maupun kuesioner yang akan dilakukan. Hasil yang didapat berupa 15 (lima belas) risiko tertinggi dalam proses pengadaan serta 7 (tujuh) tindakan pengembangan dengan penambahan kegiatan pada tahapan proses bisnis pengadaan. Dengan dilakukan pengembangan proses bisnis ini dapat meningkatkan kinerja waktu pelaksanaan dengan estimasi sebesar + 20-40% atau 3-4 bulan dengan mengurangi waktu keterlambatan pelaksanaan.

The Directorate General of Housing of the Ministry of Public Works and Public Housing which oversees the Directorate of Vertical Housing has a role in the framework of implementing housing development as a decent place to live for the community where one of the programs is with the Construction of Vertical Housing. The implementation of the construction of vertical housing has a record that there are still many that have experienced delays in the completion of work. One contributing factor is that the procurement process has not been perfect. Therefore, an analysis of the application of the business process in the process of procurement of the work needs to be done. This study aims to develop a process business for the procurement of risk-based vertical housing in The Ministry of Public Works and Public Housing, using qualitative risk analysis methods by utilizing primary and secondary data in the form of existing records and questionnaires to be conducted. The results obtained are 15 (fifteen) highest risks in the procurement process and 7 (seven) development actions with additional activities at the stage of the procurement business process. By developing this business process, it can improve the performance of the implementation time with an estimate of + 20-40% or 3-4 months by reducing the delay in implementation.

 File Digital: 1

Shelf
 T-Marendi Rahman.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xix, 137 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-25-01507656 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920561133
Cover