Ditemukan 4546 dokumen yang sesuai dengan query
Buttelwerth, John
New Jersey: Pearson-Prentice Hall, 2005
690.06 BUT c
Buku Teks SO Universitas Indonesia Library
Amirian, Homa
"This paper addresses a new robust multi objective multi period model for supply chain planning under uncertainty considering quantity discounts. The proposed model maximizes the current proht of the distributor by making a balance between the total costs of the supply chain and the distributor company s revenues of selling products and also maximizes the company s expected profit by introducing brands and taking the risk of loss on it. Considering uncertainty in the purchasing cost, selling fees, and demand fluctuations, the new robust multi objective mixed integer programming model is solved as a single objective mixed integer programming model by utilizing the LP metrics method. By settling regulatory penalty parameters and considering different economic scenarios, the robustness and effectiveness of the developed model are verified with the data from BEH PAKHSH Company, a commodities distributor in Iran. The outcomes show that the proposed model is a promising approach to run an efficient supply chain."
Philadelphia: Taylor and Francis, 2018
658 JIPE 35:4 (2018)
Artikel Jurnal Universitas Indonesia Library
Mubarak, Saleh
New Jersey: Pearson-Prentice Hall, 2005
690.06 MUB c
Buku Teks SO Universitas Indonesia Library
Dreger, J. Brian
New York: Van Nostrand Reinhold, 1992
658.404 DRE p
Buku Teks Universitas Indonesia Library
Patrick, Charles
New Jersey: Pearson/Prentice Hall, 2004
624 PAT c
Buku Teks SO Universitas Indonesia Library
Patrick, Charles
New Jersey: Pearson/Prentice Hall, 2004
624 PAT c
Buku Teks SO Universitas Indonesia Library
Vanhoucke, Mario
"The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling : the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on."
Berlin: Springer, 2012
e20397216
eBooks Universitas Indonesia Library
Vanhoucke, Mario
"The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project's time and cost reserves"
Heidelberg: Springer, 2013
658.404 VAN p
Buku Teks Universitas Indonesia Library
Vajpayee, S. Kant
Englewood Cliffs, NJ: Prentice-Hall, 1995
670.285 VAJ p
Buku Teks SO Universitas Indonesia Library
Wilson, Charles E.
Upper Saddle River, New Jersey: Prentice-Hall, 1997
621.815 WIL c
Buku Teks SO Universitas Indonesia Library