Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 6764 dokumen yang sesuai dengan query
cover
Abdul Kadir
Jakarta: UI-Press, 1998
621.319 ABD t
Buku Teks  Universitas Indonesia Library
cover
Hutauruk, T.S.
Jakarta: Erlangga, 1985
537.6 HUT t
Buku Teks SO  Universitas Indonesia Library
cover
Bagus Nurhuda
"Seiring bertambahnya jumlah pelanggan listrik di Indonesia menjadikan persentase kerugian dari susut non-teknis pada Perusahaan Listrik Negara (PLN) semakin besar tiap tahunnya yang menyebabkan berkurangnya keuntungan. Berbagai upaya telah dilakukan oleh PLN dengan membentuk tim Penertiban Pemakaian Tenaga Listrik (P2TL) berdasarkan informasi indikasi pencurian dan kelainan maupun pemilihan manual pada pelanggan pascabayar. Namun upaya yang dilakukan PLN sejauh ini masih belum efektif dalam penentuan Target Operasi (TO) karena membutuhkan waktu yang lama dengan hasil akurasi yang kecil. Tujuan dari penelitian ini adalah untuk menganalisis efektivitas dari data pemakaian listrik (kWh) pelanggan dalam pemodelan machine learning menggunakan algoritma Extreme Gradient Boosting (XGBoost) menggunakan metode feature engineering dan hyperparameter tuning. Hasil dari penelitian ini membuktikan bahwa penggunaan riwayat pemakaian listrik efektif dalam pemodelan hingga tingkat akurasi mencapai 80% pada penggunaan data jam nyala dan 82% pada penggunaan data gabungan jam nyala dengan metode statistik dan bantuan hyperparameter tuning. Dengan hasil ini dapat membantu PLN untuk menentukan TO pada pelanggan pascabayar dengan lebih mudah dan efisien menggunakan teknologi machine learning.

As the number of electricity customers in Indonesia increases, the percentage of non-technical losses in PLN (Perusahaan Listrik Negara) has been growing every year, leading to a decrease in profits. Various efforts have been made by PLN through the establishment of the Penertiban Pemakaian Tenaga Listrik (P2TL) team based on indications of theft or abnormalities and manual selection of postpaid customers. However, PLN's efforts so far have been ineffective in determining the Operational Target (TO) due to the long time required and low accuracy. The aim of this research is to analyze the effectiveness of customer electricity usage data (kWh) in machine learning modeling using the Extreme Gradient Boosting (XGBoost) algorithm with feature engineering and hyperparameter tuning methods. The results of this study demonstrate that the use of electricity usage history is effective in modeling, achieving an accuracy rate of 80% when using on/off hours data and 82% when using a combination of on/off hours data with statistical methods and the assistance of hyperparameter tuning. These findings can assist PLN in determining the TO for postpaid customers more easily and efficiently using machine learning technology."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sayyid Kamil
Depok: Fakultas Teknik Universitas Indonesia, 1995
S38548
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arief Adi Nugroho
"Dalam sistem tenaga listrik yang kompleks, terjadinya ganggan short circuit dapat timbul kapan saja. Dampak dari gangguan tersebut akan semakin parah dan berpengaruh terhadap kestabilan sistem yang ada. Pada sistem tenaga listrik Pacitan, terdapat jalur transmisi pembangkit yang merupakan jalur utama penyaluran daya aktif dari pembangkit menuju gardu-gardu induk di sekitarnya. Oleh karenanya, jalur tersebut harus diminimalisir dampak dari gangguannya. Selain itu, kapasitas cadangan dari PLTU Pacitan masih tersisa banyak untuk menyuplai beban-beban yang berlebih dan perencanaan beban yang akan mendatang. Namun, apabila kapasitas standar pembangkit ditingkatkan akan terjadi ketidakstabilan pada sudut rotor maupun daya aktif pembangkitnya. Oleh karena itu, Unified Power Flow Controller (UPFC) salah satu divais Flexible AC Transmission System (FACTS) merupakah jawaban dari kedua permasalahan tersebut. Dengan pemasangan UPFC, kestabilan dari sudut rotor dan osilasi daya aktif pembangkit dapat teredam sehingga masih dalam ambang stabil. Injeksi yang diberikan UPFC kepada sistem berupa daya reaktif dan tegangan p.u pada saluran transmisi PLTU Pacitan-Nguntoronadi dengan menganut pemasangan dengan impedansi paling besar juga memberikan keunggulan dalam menangani bus-bus yang undervoltage serta pemerataan aliran daya aktif saat pembangkit ditingkatkan 10 MW dari kapasitas standarnya.

In complex electric power systems, the occurrence of a short circuit can occur at any time. The impact of these disturbances will be more severe and affect the stability of the existing system. In the Pacitan power system, there is a generator transmission line which is the main channel for channeling active power from the generator to the surrounding substations. Therefore, the pathway must be minimized from the impact. Apart from that, there is still a lot of spare capacity from the PLTU PLTU to supply excessive loads and plan future loads. However, if the standard capacity of the generator is increased there will be instability in the rotor angle and the active power of the generator. Therefore, the Unified Power Flow Controller (UPFC), one of the Flexible AC Transmission System (FACTS) devices, is the answer to these two problems. With the installation of UPFC, the stability of the rotor angle and generator active oscillation can be damped so that it is still in a stable threshold. The injection given by UPFC to the system in the form of reactive power and p.u voltage on the transmission line of the Pacitan-Nguntoronadi PLTU with the highest impedance installation also provides advantages in handling undervoltage buses and even distribution of active power when the plant is increased by 10 MW from its standard capacity."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Abdul Kadir
Jakarta: UI-Press, 2000
621.319 Kad d
Buku Teks  Universitas Indonesia Library
cover
Aghnia Nur An Nisa
"Sistem Ereke merupakan sistem kelistrikan di kawasan sisi utara pulau Buton yang masuk wilayah Kabupaten Buton Utara. Namun pola operasi pada sistem Ereke dipasok dari sistem Baubau dan dalam beberapa kondisi dioperasikan secara isolated. Dari pola operasi tersebut, terjadi beberapa kondisi yaitu kualitas tegangan yang buruk akibat letak geografis Ereke dan Baubau terlampau jauh ±199,1 kms, kemudian apabila terjadi padam meluas/padam total (Blackout) proses penormalan pada sistem Ereke membutuhkan waktu yang cukup lama karena kondisi Ereke yang berada di ujung jaringan dan tercatat pada tahun 2021, sistem Ereke mengalami padam total sebanyak 63 kali. Dari hasil analisis diperoleh bahwa apabila menggunakan pola operasi dipasok dari sistem Baubau, maka biaya yang dibutuhkan sebesar Rp 1.159.452.493,9/bulan dengan tegangan pangkal 15,6 kV pada pelanggan serta lamanya pemulihan pasca padam meluas/padam total dan apabila isolated Rp 1.622.262.413,2/bulan dengan tegangan pangkal 19,7 kV namun biaya lebih mahal namun dapat mengurangi lama waktu pemulihan pasca gangguan karena jaringan lebih pendek dan rugi jaringan berkurang. Selain itu, nilai SAIDI pada bulan Mei 2021 yaitu 5,03 jam/pelanggan/tahun dan SAIFI 5,97 kali/pelanggan/tahun. Dengan demikian, pilihan terbaik dalam pengembangan sistem pembangkitan di Ereke adalah dengan membangun sistem Ereke interkoneksi dengan sistem Baubau dengan disertai dengan pembangunan sejumlah penyulang untuk menaikkan kualitas tegangan dan kehandalan sistem Ereke dan menggunakan simulasi pada software DigSilent. Semua analisa mempertimbangkan RUPTL terbaru tahun 2021-2030.

The Ereke system was an electrical system used on the northern Buton island, a part of the North Buton Regency. The operating methods on the Ereke system were the operation method which was supplied from Baubau system and, in some conditions, isolated operation. There were several conditions caused by those operating methods, which were the poor voltage quality due to the geographical distance from Ereke to Baubau that were too far (±199,1 kms) and the long duration of the normalization process if there was a widespread blackout since Ereke was located at end of the network. In addition, the Ereke system experienced a total of 63 outages in 2021. From the analysis result, it was obtained that the operating method which was supplied from the Baubau system will cost Rp. 1,159,452,439.9/month with 15.6 kV base voltage and a long normalization duration after blackout/total blackout. On the other hand, it was also obtained that the isolated operation method will cost Rp. 1,622,262,413.2/month with 19.7 kV base voltage which was more expensive but with a shorter normalization duration after interruptions due to shorter network and the decreased network loss. Otherwise, the SAIDI value in May 2021 is 5.03 hours/customer/year and SAIFI 5.97 times/customer/year Therefore, developing interconnection of Ereke system and Baubau system along with the constructions of feeders to increase the voltage quality and reliability also with the use of DigSilent simulation software will improve the quality of electrical generation development in Ereke. The latest RUPTL (2021-2030) was considered through every analysis."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Artono Arismunandar
Jakarta: Universitas Indonesia, 1977
530.1 ART e (1)
Buku Teks  Universitas Indonesia Library
cover
Fajar Tri Wardana
"ABSTRAK
Dalam sistem tenaga listrik, penyaluran tenaga listrik yang baik merupakan hal yang vital dalam memenuhi kebutuhan beban. Kapasitas penyaluran daya pada saluran transmisi dibatasi oleh batas Surge Impedance Loading (SIL). Saat saluran transmisi dibebani pada nilai SIL-nya maka saluran transmisi tersebut akan bersifat resistif murni. Apabila saluran transmisi bersifat resistif murni maka nilai susut tegangan akan semakin berkurang dan akan memperbaiki kualitas daya. Tegangan yang berada dibawah nilai normalnya akan menyebabkan peralatan listrik tidak bekerja dengan maksimal. Saat level SIL suatu saluran transmisi dinaikkan maka kapasitas suatu saluran transmisi juga akan bertambah. Menaikkan level SIL dapat dilakukan dengan mengubah-ubah konfigurasi saluran transmisi tersebut. Pengubahan yang dilakukan antara lain, memperbesar diameter konduktor, menjauhkan jarak antar subkonduktor, menambah jumlah subkonduktor perfasa dan mendekatkan jarak antar fasa. Dari semua variasi tersebut akan dilihat nilai SIL dan susut tegangan dari saluran transmisi 500kV TASIK-DEPOK. Dari hasil yang diperoleh dapat diambil kesimpulan bahwa nilai SIL terbesar terjadi saat jumlah subkonduktor sebanyak 6 buah dengan jarak antar subkonduktor 80cm. SIL terbesar bernilai 2429.4543 MW dan % tegangan bus DEPOK tertinggi adalah 96.81%.

ABSTRACT
In electric power systems, the good electric power transmission is vital to occupy the load requirements. Power transmission capacity on transmission lines restricted by Surge Impedance Loading (SIL). When the transmission line loaded at its SIL value then the transmission line will be purely resistive. If the transmission line is purely resistive then the value of drop voltage will decrease and will improve the power quality. Voltage that below its normal value would cause the electrical equipment does not work in the maximum performance. When a transmission line SIL level is increased, the capacity of a transmission line will also increase. Increasing the level of SIL can be done by changing the configuration of the transmission line. The conversion is done inter alia, expand the diameter of the conductor, increasing the distance between subconduktor, increasing the number of subconduktor per phase and decreasing the gap between phases. From all of these variations will be seen the value of SIL and drop voltage of 500kV transmission line TASIK-DEPOK. From the results obtained it can be concluded that the value of the largest SIL occurs when the number of subconduktor as much as 6 pieces with subconduktor distance between 80cm. The highest SIL is 2429.4543 MW and the highest %voltage of DEPOK bus is 96.81%."
2016
S62705
UI - Skripsi Membership  Universitas Indonesia Library
cover
Panggabean, Solomon M.R.
"Sistem tenaga listrik modem menggunakan pengatur tegangan dan sistem penguatan medan, untuk menjaga kestabilan sistem terhadap ganggguan. Pada suatu sistem penguatan medan dapat ditambahkan Pembatas Eksitasi Kurang (Under Excitation Limiter). Fungsi Pembatas Eksitasi Kurang (PEK) adalah menjaga kestabilan generator terhadap panas pada inti jangkar, mencegah kehilangan eksitasi oleh gangguan yang cukup ekstrim. PEK bekerja berdasarkan galat pengatur tegangan dan tegangan acuan. Setelah diolah PEK, sinyal ini diteruskan ke medan generator untuk mengembalikan tegangan medan pada nilai yang diinginkan.
Simulasi dalam tesis ini memerlukan kurva kemampulan generator. Generator diberi nilai daya yang berada di luar kurva, yang memisalkan keadaan tidak stabil. Hasil simulasi menunjukkan bahwa tegangan terminal dikembalikan kepada nilai keadaan stabil. Tanggapan tegangan medan mirip dengan tanggapan fungsi orde satu dengan masukan fungsi undak.
Parameter PEK harus disesuaikan dengan batas kestabilan generator. Batas kerja PEK didasarkan pada kurva kemampuan generator. Simulasi meninjau sistem satu pembangkit dengan daya 2 KW dan satu bus tak terhingga (infinite bus). Namun hasilnya dapat diterapkan pada sistem dengan daya lebih besar. Untuk pengembangan studi tentang PEK, dapat diteliti penggunaannya bersama Pembatas Eksitasi Lebih (Over Excitation Limiter), dan pada sistem dengan banyak bus tak terhingga.

Modem power systems apply voltage controller and excitation systems to keep their stability against disturbance. To the excitation system can be added an under excitation limiter (UEL}. UEL functions to keep generator's stability against armature core overheating, and loss of excitation due to relatively big disturbances. UEL operates by using the error between controller's output and reference voltage. After being processed by the UEL, the signal is passed to the generator's field to return the field voltage to its desired value.
Simulation in this thesis needs generator capability curve. The generator was given a power value outside the curve. The value reflected an instable condition. The results of the simulation showed that terminal voltage was brought back to a value in the stable region. The field voltage response is similar to a first order response with step function input.
UEL parameters should be adjusted to the generator's stability limits. UEL's limit is based on generator capability curve. The simulation observed a 2 KW generator system connected to an infinite bus. However the results can be applicable to bigger systems. Continuing the study on UEL, further UEL experiments together with over excitation limiters (OEL), and its use on an many infinite buses can be conducted.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T5798
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>